Renewable Pipeline

 

As of September 2023, 518 renewable electricity projects with a capacity of 23.7 GW are in the pipeline (Figure 4). 4.2 GW of these are under construction, most of which are wind turbine installations. 7.1 GW are awaiting construction and 12.5 GW in planning.

Figure 4: Renewable electricity pipeline capacity by planning stage and technology (at September 2023)

A blue squares with textDescription automatically generated

A graph of progress on a white backgroundDescription automatically generated with medium confidence

 