Evaluation of the Regional Land Use Framework Pilots

This report presents results from the evaluation of two local authority led Regional Land Use Framework pilot projects.


Footnotes

1. Scottish Government (2013, Unpublished) Project Specification. Regional Land Use Framework Pilots. Scottish Government (p2)

2. Scottish Government (2013, Unpublished), Project Specification. Regional Land Use Framework Pilots.

3. See Appendix 1 for further details.

4. The Aberdeenshire pilot produced an Issues and Opportunities report as opposed to a framework document. For the purposes of this evaluation it is viewed as a suitable proxy for a regional framework and has been assessed in the same way as the Scottish Borders framework document.

5. The pilot also organised a fourth workshop for land use practitioners from outside of Aberdeenshire.

6. Upper Deeside was an existing JHI research site. Huntly was chosen by participants in the first review workshop based on a list of criteria agreed during the workshop.

7. Aberdeenshire Council (2013) Aberdeenshire Land Use Strategy Pilot: Stage 1 Report. Aberdeenshire Council (p. 9 para, 9.2 )

8. Davidson J.; Birnie,I.; Irvive,R.J,; Gimona, A.; Blackstock,K.; Baggio, A; Byg, A.; Donelly, D.; Somevi ,J.; Aalders,I.; Dunn,S.and Sample, J.(2015) Aberdeenshire Land Use Strategy Pilot: Final Report. Aberdeenshire Council (p. 25, para. 13.15)

9. Tweed Forum (2014) Consultation Report for Scottish Borders Council on the Tweed Forum-led Stakeholder Engagement (p. 12)

10. Ibid (p.52)

11. Ibid (p.55)

12. Ibid (p.12)

13. Ibid (p. 53)

14. Ibid (p. 55)

15. Aberdeenshire Council (2015), Land Use Change Issues and Opportunities for Aberdeenshire (2015). Aberdeenshire Council. (p.11, para 5.5)

16. Scottish Borders Council and Tweed Forum (2015) Scottish Borders Pilot Regional Land Use Framework (p.4)

17. Aberdeenshire Council (2015), Land Use Change Issues and Opportunities for Aberdeenshire (2015). Aberdeenshire Council. (Page 25, para 10.6).

18. Ibid (page 27, para RA 1).

19. Ibid (page13 para 6.0)

20. Ibid (page10, para 4.31).

21. Ibid (p.26, para 10.7).

22. Ibid (p.29, para RA3),

23. Ibid (p.25, para 10.6)

24. Ibid (p.8, para 4.23)

25. Scottish Borders Council and Tweed Forum (2015) Scottish Borders Pilot Regional Land Use Framework (p.8).

26. Ibid (p.48).

27. Aberdeenshire Council (2015), Land Use Change Issues and Opportunities for Aberdeenshire (2015). Aberdeenshire Council (p.18).

28. Natural Scotland (2011), Applying an Ecosystems Approach to Land Use: Information Note. Scottish Government..Available at http://www.gov.scot/Publications/2011/03/16083740/1

29. Davidson, J.1; Birnie, I.1,3; Irvine, R. J.2; Gimona, A.2; Blackstock, K.2; Baggio, A.2; Byg, A.2; Donnelly, D.2; Somevi, J.1; Aalders, I.2; Dunn, S.2 and Sample, J2. (2015), Aberdeenshire Land Use Strategy Pilot: Final Report, Aberdeenshire Council (p. 23)

30. Davidson, J.1; Birnie, I.1,3; Irvine, R. J.2; Gimona, A.2; Blackstock, K.2; Baggio, A.2; Byg, A.2; Donnelly, D.2; Somevi, J.1; Aalders, I.2; Dunn, S.2 and Sample, J2. (2015) Aberdeenshire Land Use Strategy Pilot Final Report. Unpublished, prepared on behalf of the Project Board of the Aberdeenshire Land Use Strategy Pilot. (p.2)

31. Scottish Borders Council and Tweed Forum (2015) Scottish Borders Pilot Regional Land Use Framework (p. 2)

32. LUS Evaluation Interim Report , CAG Consultants, July 2014. (p. 23) (unpublished)

33. Scottish Government (2013), Project Specification Regional Land Use Framework Pilots. Scottish Government (p. 4 para 3.1) (unpublished)

34. Ibid (p. 4 para 3.2)

Contact