Fees charged for applications under the Electricity Act 1989 consultation: our response

Our response to the consultation on proposals to revise fees paid for applications under the Electricity Act 1989, providing details of the changes which Ministers intend to implement. The decision to increase fees follows a careful consideration of all the points raised by respondents to our consultation.


6. Schedule of Fees

Section 36 – Installed Capacity (Megawatt) Based Fees: EIA

Table 1: Current and consulted on proposed fees for applications under section 36 or 36C of the Act – electricity generating stations (EIA)

Threshold (MW) 0 - 10 10 - 50 50 -100 100 - 200 200 - 500 500 +
S36 EIA construction Current £6k £18k £18k £24k £36k £60k
Consulted £10.8k £54k £190k £234k £350k £540k
S36 EIA extension Current £6k £18k £18k £24k £36k £60k
Consulted £8.1k £40.5k £190k £234k £350k £540k
S36C EIA variation Current £0 £0 £0 £0 £0 £0
Consulted £10.8k £54k £190k £234k £350k £540k

Table 2: Fees to be implemented for applications under section 36 or 36C of the Act – electricity generating stations (EIA)

Threshold (MW) 0 - 10 10 - 50 50 - 100 100 - 300 300 +
S36 EIA construction or extension £7,000 £35,000 £125,000 £180,000 £280,000
S36C EIA variation £5,250 £26,250 £93,750 £135,000 £210,000

Sections 36 and 36C – Installed Capacity (Megawatt) Based Fees: Non-EIA

Table 3: Current and consulted on fees for applications under section 36 or 36C of the Act – electricity generating stations (non EIA)

Threshold (MW) 0 - 10 10 - 50 50 -100 100 - 200 200 - 500 500 +
S36 non EIA construction Current £6k £18k £18k £24k £36k £60k
Consulted £7.6k £37.8k £125k £167k £250k £417k
S36 non EIA extension Current £6k £18k £18k £24k £36k £60k
Consulted £7.6k £37.8k £125k £167k £250k £417k
S36C non EIA variation Current £0 £0 £0 £0 £0 £0
Consulted £7.6k £37.8k £125k £167k £250k £417k

Table 4: Fees to be implemented for applications under section 36 or 36C of the Act – electricity generating stations (non EIA)

Threshold (MW) 0 - 10 10 - 50 50 -100 100 - 300 300 +
S36 non EIA construction or extension £6,500 £25,000 £70,000 £100,000 £150,000
S36C non EIA variation £4,875 £18,750 £52,500 £75,000 £112,500

Sections 36 and 36C – Fees Where Application Does Not Relate To Installed Capacity

Table 5: Current and consulted on proposed fees for applications under section 36 or 36C of the Act other than for construction or extension of generating capacity

Application type Fee Section 36 application Section 36C variation
Extension of nuclear generating station by retrofitting of emission control equipment Current £6k £0
Consulted £125k £125k
Any other extension of a generating station Current £1.2k £0
Consulted £25k £25k
Operation only or change to manner of operation of a generating station Current £1.2k £0
Consulted £25k £25k

Table 6: Fees to be implemented for applications under section 36 or 36C of the Act other than for construction or extension of generating capacity

Application type Section 36 application Section 36C variation
Extension of nuclear generating station by retrofitting of emission control equipment £35,000 £26,250
Any other extension of a generating station £25,000 £18,750
Operation only or change to manner of operation of a generating station £25,000 £18,750

Section 37 – Overhead Electric Lines

Table 7: Current and consulted on proposed fees for Section 37 applications

Application type Fee Length of overhead line (km)
Up to 15 15 – 50 50 - 100 100 +
S37 EIA Current £2.4k £18k £30k £60k
Consulted £25.5k £175k £322k £585k
S37 non-EIA Current £180 £18k £30k £60k
Consulted £2.1k £175k £322k £585k

Table 8: Fees to be implemented for Section 37 EIA applications

Application type Length of overhead line
Less than 1km 1km or greater
S37 EIA £1500 £1500 per km*
(capped at £300,000)

*Lengths over 1km will be rounded to the nearest whole kilometre.

Table 9: Fees to be implemented for Section 37 non-EIA applications

Application type Length of overhead line
Not exceeding 500m Exceeding 500m but less than 15km 15km or greater
S37 non EIA £360 £600 per km*
(capped at £4,000)
£9,000 plus
£600 per km* (capped at £150,000)

*Lengths over 500m will be rounded to the nearest whole kilometre.