Environmental statement of Grangemouth biomass plant: EIR release
- Published
- 6 April 2018
Information request and response under the Environmental Information (Scotland) Regulations 2004.
FOI reference: FOI/18/00720
Date received: 7 March 2018
Date responded: 5 April 2018
Information requested
A copy of the Environmental Statement for 'The Port of Grangemouth Biomass Electricity Generating Station' application.
Response
1. I now enclose all of the documentation that we hold and forms as part of the Environmental Statement, this includes the required transport chapters.
Documents released:
1. Appendix A-D of Environmental Statement (uploaded)
2. Appendix E of Environmental Statement (a)
3. Appendix F-G of Environmental Statement (uploaded)
4. Grangemouth Renewable Energy Plant Planning Statement (uploaded)
5. Grangemouth Renewable Energy Plant: Design Concept Statement (uploaded)
6. Sustainability Statement for the Grangemouth Renewable Energy Plant (uploaded)
7. S36 Application for Consent Team (uploaded)
8. Addendum in support of Grangemouth Biomass Plant Application (a)
9. EIA Scoping Report Addendum -2010 (uploaded)
10.EIA Scoping Report -2009 (uploaded)
11. Volume 1 – Non Technical Summary (uploaded)
12. Volume 2 - Environmental Impact Assessment chapters 1-9 (uploaded)
13. Volume 2 - Environmental Impact Assessment chapters 10-14 (uploaded)
14. Volume 2 – Environmental Impact Assessment chapters 15-19 (uploaded)
15. Volume 4 – Environmental Impact Assessment Transport Statement (a)
16. Volume 5 – Environmental Impact Assessment – figures 10.6 to 10.13 (uploaded)
17. Volume 5 – Environmental Impact Assessment – figure index (uploaded)
18. Volume 5 – Environmental Impact Assessment – figures 9.1 to 9.4 (uploaded)
19. Volume 5 – Environmental Impact Assessment – figures 1.1 and 1.2 (uploaded)
20. Volume 5 – Environmental Impact Assessment – figures 6.1 to 6.5 (uploaded)
21. Volume 5 – Environmental Impact Assessment – figures 7.1 (uploaded)
22. Volume 5 – Environmental Impact Assessment – figures 8.1a to 8.1b (uploaded)
23. Volume 5 – Environmental Impact Assessment – figures 9.5 to 9.8 (a)
24. Volume 5 – Environmental Impact Assessment – figures 10.01 to 10.5 (a)
25. Volume 5 – Environmental Impact Assessment – figures 10.14 to 10.20.2 (a)
26. Volume 5 – Environmental Impact Assessment – figures 10.21 to 10.28 (a)
27. Volume 5 – Environmental Impact Assessment – figures 11.1 to 18.1 (a)
28. Volume 6 – CHP Feasibility Study (uploaded)
29. Volume 6 – Fire Prevention Method Statement (uploaded)
30. Volume 6 – Statement of Participation (a)
(a) Due to the file size of the documents released, copies can be provided on request by emailing ceu@gov.scot, quoting the FOI reference number FOI/17/00720.
About FOI
The Scottish Government is committed to publishing all information released in response to Freedom of Information requests. View all FOI responses at http://www.gov.scot/foi-responses
- File type
- 230 page PDF
- File size
- 2.6 MB
- File type
- 5 page PDF
- File size
- 2.6 MB
- File type
- 171 page PDF
- File size
- 2.6 MB
- File type
- 47 page PDF
- File size
- 1.4 MB
- File type
- 6 page PDF
- File size
- 2.1 MB
- File type
- 62 page PDF
- File size
- 2.5 MB
- File type
- 38 page PDF
- File size
- 2.6 MB
- File type
- 160 page PDF
- File size
- 2.6 MB
- File type
- 19 page PDF
- File size
- 2.0 MB
- File type
- 19 page PDF
- File size
- 2.4 MB
- File type
- 53 page PDF
- File size
- 1.9 MB
- File type
- 115 page PDF
- File size
- 2.3 MB
- File type
- 6 page PDF
- File size
- 2.5 MB
- File type
- 4 page PDF
- File size
- 2.3 MB
- File type
- 4 page PDF
- File size
- 1.8 MB
- File type
- 4 page PDF
- File size
- 1.9 MB
- File type
- 4 page PDF
- File size
- 2.5 MB
- File type
- 9 page PDF
- File size
- 3.3 MB
Contact
Please quote the FOI reference
Central Enquiry Unit
Email: ceu@gov.scot
Phone: 0300 244 4000
The Scottish Government
St Andrew's House
Regent Road
Edinburgh
EH1 3DG
There is a problem
Thanks for your feedback