Heat Network Projects: quarterly report - March 2024
Information on the capital and pre-capital projects which have been funded through Scotland's Heat Network Fund, Low Carbon Infrastructure Transition Programme and the Heat Network Support Unit.
LCITP Capital Projects
AMIDS District Heating Network
Project Organisation:
Renfrewshire Council
Technology type(s):
Treated water converted into ambient heat directed through underground network and upgraded using heat pumps
Location:
Paisley, Renfrewshire
Grant value:
£3,136,968
Completion date:
March 2023
Project description:
Renfrewshire Council has developed a state-of-the-art, low carbon heating network at the Advanced Manufacturing Innovation District Scotland (AMIDS) including the National Manufacturing Institute Scotland (NMIS) and the Medicines Manufacturing Innovation Centre. The first of its kind in Scotland, the fifth-generation renewable energy network works by directing treated water into a new energy centre, where low temperature heat is extracted and channelled through a 3.7km underground pipe loop. Heat pumps at each building upgrade this heat to suitable levels for heating and hot water. The network provides a cost-effective route to low carbon heating, an attractive proposition for major manufacturers locating at AMIDS and is future-proofed to supply further developments nearby.
Abbey Ecosse
Project Organisation:
Abbey Ecosse
Technology type(s):
Energy system comprising an anaerobic digestion plant, biogas engine, peak demand biogas boiler, EV chargers, electrical storage and grid export.
Location:
Forss Energy and Business Park, Thurso
Grant value:
£1,111,975 LCITP Grant
Completion date:
February 2024
Project description:
The Project will install and commission an integrated low carbon energy network, which comprises of a combination of an anaerobic digestion (AD) plant providing heat and power to the site; biogas gas engine; peak demand biogas boiler; electrical storage and grid export. The Old Poultney Distillery will provide by-products to the AD plant for the generation of biogas. EV charging points will be used by commuters between Thurso and establishments such as Dounreay Nuclear Facility as well as by tourists utilising the North Coast 500 route. It is estimated that the project will achieve carbon savings of 130,612 kg CO2e pa, representing a 86% reduction relative to business as usual.
Torry Heat Network, Phase 1
Project Organisation:
Aberdeen City Council
Technology type(s):
Heat network, Energy from Waste (EfW)
Location:
Torry, Aberdeen
Grant value:
£5,787,235 LCITP Grant
Completion date:
Winter 2023
Project description:
The project developed a new district heating network, distributing heat from a Heat Distribution Facility at Tullos Recycling Centre and a heat offtake at the new Energy from Waste plant at Tullos. The project links to the existing HeatNet district heat network to provide additional connections to domestic, local authority and third sector customers. LCITP funding was granted for the construction of the new district heating network infrastructure, and the construction of the undertrack rail crossing, enabling district heat network pipework to be routed between Greenwell Road and Tullos Primary School.
Zero Carbon Affordable Homes
Project Organisation:
LAR Housing Trust
Technology type(s):
Shared-ground loop heat pumps and thermal storage
Location:
Fountainbridge, Edinburgh
Grant value:
£128,283 LCITP Grant
Predicted completion date:
April 2024
Project description:
The project will install a shared group loop array heating system with ground source heat pumps and high efficiency heat batteries to serve 14 properties (10 affordable flats and 4 houses) in Fountainbridge, Edinburgh. The 10 flats included in the project will then be made available for mid-market rent. The project is predicted to produce carbon savings of 47,560 kg CO2e when compared to business-as-usual scenarios when it commissions in April 2024.
Glen Mhor Heat Project
Project Organisation:
Glen Mhor Ltd
Technology type(s):
Energy centre with 1MW water source heat pump
Location:
Glen Mhor Hotel, Inverness
Grant value:
£1,646,642 LCITP Grant
Predicted completion date:
March 2024
Project description:
The project will install and commission a new energy centre which will house a 1 MW water source heat pump and use water from the River Ness to supply heat to the Glen Mhor Hotel in Inverness. It is hoped that additional connections to the heat network may be feasible in the future, such as connecting a planned Brewery and Visitor Centre development at the hotel as well as a nearby Church of Scotland and social housing development. However, none of these connections have been confirmed at this stage.
The project is expected to reduce emissions by approximately 730 tonnes CO2 pa and commission in March 2024.
Millerhill Low Carbon District Heating Project
Project Organisation:
Midlothian Council
Technology type(s):
Construction of energy centre and heat network using heat from the Millerhill Energy from Waste Plant
Location:
Shawfair, Midlothian
Grant value:
£7,407,000 LCITP Grant
Predicted completion date:
Summer 2024
Project description:
The Project will install an exemplar low carbon district heating network at the new, emerging town of Shawfair which uses heat from the Millerhill Energy from Waste plant to deliver heat to the first plots of the Shawfair development. This initial network will be capable of expansion into the wider Midlothian, East Lothian and Edinburgh areas. The new joint venture ESCO between Midlothian Council, Vattenfall Heat UK and Midlothian Energy Limited has now been established and will lead on securing relevant heat off-take and supply agreements with the relevant parties and establishing an appropriate and a tiered tariff structure for end users.
Granton Waterfront Western Villages
Project Organisation:
The City of Edinburgh Council
Technology type(s):
District heating system using air and water source heat pumps; solar PV, energy efficiency improvements and enhanced utilities with smart controls for metering and billing.
Location:
Granton Waterfront Development, North Edinburgh
Grant value:
£4,102,801 LCITP Grant
Predicted completion date:
October 2024
Project description:
The project will deliver low carbon heat to 444 new-build properties in the Granton Waterfront Western Villages development through the use of nine external air source heat pumps, seven water to water heat pumps and a district heating pipe network to each apartment block. Each property will also be fitted with solar PV, enhanced utilities and fabric improvements.The predicted carbon savings from the project are approximately 317.8 tonnes CO2 pa - when compared to a gas heating system.
Clyde Heat
Project Organisation:
Peel NRE Developments Ltd
Technology type(s):
Water source heat pumps, high efficiency back up boilers and heat network infrastructure
Location:
Glasgow Harbour Development
Grant value:
£5,100,000 LCITP Grant
Predicted completion date:
December 2025
Project description:
The project will install two 1.5MW water source heat pumps which will supply low carbon heat via a heat network. The heat network will serve the Glasgow Harbour Development, notably Yorkhill Quay and Therme spa. The project will commission 15.2MW of high efficiency boilers to meet peak loads. The development is planned to consist of a mix of commercial, residential and leisure end users who will be offered low carbon heat at a competitive rate.
Contact
Email: HeatNetworkFund@gov.scot
There is a problem
Thanks for your feedback