Annex A: IIP Project Pipeline Summary – by funding type and sector

The following table summarises the published IIP Project Pipeline by funding type for each of the sectors and breaks down the investments by year in which construction commenced or is expected to commence.

  • Where the total value of a project has a range, the upper range figure has been used.
  • For those revenue funded projects which also have associated capital funding elements (NPD, hub and RAB), the separate capital funding figures have been included at Capital DEL and consequently the figures in the number of projects column will be higher than the number of projects within the IIP Project Pipeline.
Type of Funding Sector Total number of projects funded Total value of all projects (£m) Total value of projects completed since 31 October 2018 (£m) Total value of projects currently in construction and those planned to commence construction in 2019-20 (£m) Total value of projects planned to commence construction in 2020-21 and beyond (£m)
Capital DEL Transport 7 650.4 276.0 374.4 0
Health 12 347.2 4.6 342.6 0
Health (on hold) 1 0.6 0 0 0
Schools 21 274.5 37.6 236.9 0
Further Education 1 78.0 0 78.0 0
Justice 5 414.9 0 89.4 325.5
Total   47 1,765.6 318.2 1,121.3 325.5
Non Profit Distributing: Revenue Funded Transport 1 469.0 469.0 0 0
Health 2 155.1 0 155.1 0
Total   3 624.1 469.0 155.1 0
hub: Revenue Funded Health 11 417.7 43.0 206.7 168.0
Health (on hold) 1 10.6 0 0 0
Schools 10 252.0 32.9 219.1 0
Total   22 680.3 75.9 425.8 168.0
Regulatory Asset Base: Revenue Funded Transport 5 1,535.7 159.0 1,376.7 0
To be confirmed Further Education 1 93.5 0 0 0
Grand Total   78 4,699.2 1,022.1 3,078.9 493.5