Planning decision: onshore transmission works, Cockenzie, Prestonpans, East Lothian
- Published
- 9 April 2018
Planning proposal relating to onshore transmission works at former Cockenzie power station, Prestonpans, East Lothian. This case is closed.
Status of case: closed
Action: planning permission granted
Action date: 22/02/2019
Scottish Government reference number: CIN-ELN-001
Planning authority reference number: 18/00189/PPM
Planning authority: East Lothian Council
Scottish Ministers may intervene in determining a planning proposal, whether an application or an appeal, where it is felt there is a national interest in doing so. We make all correspondence between ourselves, planning authorities and Historic Environment Scotland relating to each case's progress available to the public.
The attached documents relate to the planning application for the proposed onshore transmission works associated with Inch Cape offshore wind farm comprising the construction, operation and decommissioning of onshore substation electricity cables and associated infrastructure required to export electricity from the offshore wind farm to the national electricity transmission system at the former Cockenzie Power Station site, Prestonpans, East Lothian (ref. CIN-ELN-001):
- reference of application direction letter
- decision letter granting planning permission
More information
Planning Circular 3 2009: Notification of Planning Applications provides context to the above proposal.
- File type
- 3 page PDF
- File size
- 130.2 kB
- File type
- 9 page PDF
- File size
- 319.6 kB
Contact
Email: planning.decisions@gov.scot
Telephone: 0131 244 7073
Post:
Area 2-H (South)
Planning and Architecture Division
The Scottish Government
Victoria Quay
Edinburgh
EH6 6QQ
There is a problem
Thanks for your feedback