The Scottish Government agrees with the Panel that there are characteristics of investor friendly states that Scotland should seek to emulate and that require a new and very different approach if Scotland is to attract the scale of global capital required. The Government accepts this challenge.
Scottish Government Response
The Scottish Government is clear that delivering the physical infrastructure necessary for a just transition to net zero will require public and private capital investment on an unprecedented scale over many years, at a time when public finances are extremely stretched. We are also clear that such investment has the potential to generate significant economic growth and create new jobs and industries right across Scotland.
The Investor Panel's report and recommendations are therefore particularly welcome. Following consideration of those recommendations, the Scottish Government:
- agrees that we need to change how we and our agencies work so that Scotland better resembles the characteristics of destinations that investors find attractive;
- understands that to get to net zero and realise associated economic opportunities, external finance is essential and that the providers of this finance require a competitive reward for the risks that they are taking;
- agrees we need to take a serious, professional and consistent approach to investor relations and engagement; and
- recognises that, in the context of attracting capital investment, scale matters.
Furthermore, following discussions with the Panel over recent months we have already taken a number of decisions informed by the Panel's work.
The Panel noted that:
"ScotWind has the scale to attract global investor interest… and that projects like ScotWind will require a fundamental shift from funding to financing and for the public and private sectors to work closely together."
In October, the First Minister announced the Scottish Government's commitment to invest up to £500m of public sector funds in offshore renewables. This commercial and grant investment will stimulate and support private investment in the infrastructure and manufacturing facilities critical to the growth of our world-leading offshore wind sector. We are working with Crown Estate Scotland, the Scottish National Investment Bank and our enterprise agencies to ensure the strategic alignment of our approach and that of the Strategic Investment Model (SIM) which brings together ScotWind developers to identify shared investment needs. This investment and approach will take account of the Panel's wider recommendations on ScotWind.
On investor engagement, the Panel recommended that:
"Although it will involve additional costs, Scotland's profile could be significantly raised in the international capital markets by using existing devolved powers to issue debt. This will provide a motivation for regular engagement by investors and an opportunity to market Scotland's investment story. It would also allow the development of relationships with providers of debt, a track record and credit rating."
The Scottish Government agrees that it is important that we consider all means to raise Scotland's profile, engage with investors and attract investment. Following the fiscal framework review we are also of the view that it is the right time to re-assess how we use our borrowing powers. Given this, we have already started a process of due diligence on this proposal. This will involve consultation with banks, credit agencies, financial experts and the Treasury, with the aim of making the bonds available to the market by the end of the current parliamentary session. Only if fiscal, economic and value for money conditions are satisfied will the recommendation be taken forward. Further details on next steps will be provided alongside the Scottish Budget in December 2023.
Investment Strategy and Delivery Unit
We have also established a new Investment Strategy & Delivery Unit within the Scottish Government. This Unit, which over time will draw in and on experience and expertise from our public sector partners and the private sector, will:
- lead and co-ordinate the effective implementation of the Panel's recommendations;
- shape, influence and support relevant policy and delivery teams to attract mobile capital investment;
- convene policy, delivery and regulatory interests across the public sector to create a more 'investor friendly' environment and support the delivery of specific, priority investments;
- develop consistent approaches and methodologies for how government and public sector bodies identify and engage with large scale investment opportunities and investors; and
- establish clear routes for investor engagement.
Links to New Deal for Business Group
More broadly, there is a strong read across between work being driven forward through the New Deal for Business Group (NDBG) and some of the Panel's recommendations on the Government's relationship with investors and if and how we consider the impact of policy and regulation on investment and investor sentiment. The NDBG brings together government and business leaders to actively work together to achieve common goals, aligning Scottish Government policy with business. Its recent Implementation Plan seeks to ensure that there is honest and open dialogue between business and the Scottish Government which enables business to thrive and that informed choices are made around the timing, content and practical consequences of new policies.
Initial Response
The improvements we are making to processes and practice across the Scottish Government to deliver the NDBG Implementation Plan, and the principles that underpin them, will also support delivery of some of the Panel's recommendations.
The Scottish Government's initial response to each of the Investor Panel's 31 recommendations on Strategic Direction, Engagement, and Delivery is set out below. Some of the recommendations will be delivered relatively quickly but others require detailed work, sustained effort and cultural change across Government and public sector partners. We will publish a progress report on delivery by June 2024.
Investor Panel Recommendations |
Initial Scottish Government Response |
---|---|
Strategic Direction |
|
The current public sector landscape around attracting mobile capital needs to |
The Scottish Government, a number of public bodies (notably Scottish Enterprise, Scottish Futures Trust and the Scottish National Investment Bank) and local government all play a role in attracting mobile capital. Our actions in response to recommendations 13-15, led by the Investment Strategy and Delivery Unit, will seek to bring coherence |
The Scottish Government should review the balance between its narrowly focussed regulatory roles and processes, as well as those of its agencies and local government against the need to attract investment at scale to achieve the wider strategic goal of achieving |
As the Panel has indicated, the National Planning Framework 4 requires planning authorities to give weight to the global climate emergency. We will give careful consideration to if and how a similar approach might be taken to other regulatory roles and processes and how those processes, and associated timescales, might be improved to attract investment at scale. |
National and Local Government need to be disciplined and clear about their role in infrastructure projects; for example whether this is as |
We will work with public and private partners to help bring greater clarity and definition to the different roles that national, local government and public bodies play in infrastructure projects at different stages in their development and delivery; and to help communicate that to projects and the investment community. |
Net zero and sector priorities need to be clearly articulated in Government strategies in |
We accept that Government strategies are not always clear about how net zero and sector priorities will be delivered. Future strategies such as the forthcoming Green Industrial Strategy and Just Transition Plans will take account of this recommendation. |
The concept of subsidiarity needs to be reviewed in the context of delivering infrastructure critical to the transition to net zero. Where projects can be designed |
Following the Panel's advice, the Scottish Government recognises that, in the context of delivering infrastructure and attracting capital investment, scale matters. It therefore agrees that projects need to be designed and delivered at the right scale – national |
The Scottish Government's interaction with regulators, including those at the UK |
The Scottish Government already works closely with regulators at both Scottish and Whilst recognising the independent role of regulators, we agree that further work is required to strengthen relationships at both the strategic and operational level to expedite the delivery of major infrastructure projects. As we develop a shaped, costed and prioritised investment pipeline, see Recommendation 9, we will identify the |
Investor Panel Recommendations |
Initial Scottish Government Response |
---|---|
Investor Engagement |
|
The most appropriate providers of finance and expertise need to be identified and segmented. A serious, professional and consistent relationship management approach needs to be taken |
As we develop a shaped, costed and prioritised investment pipeline we will identify the most appropriate providers |
Although it will involve additional costs, Scotland's profile could be significantly raised in the international capital markets by using existing devolved powers to issue debt. This will provide a motivation for regular engagement by investors and an opportunity to market Scotland's investment story. It would also allow the development of relationships with providers of debt, a track record and credit rating. |
A process of due diligence on this proposal, involving consultation with banks, credit agencies, financial experts and the Treasury has begun. If fiscal, economic and value for money conditions are satisfied, the aim is |
The current investment pipeline is too diffuse. A pipeline needs to be formed of projects that are properly costed, shaped and prioritised. It needs to be a real pipeline, not a wish list. |
Working with partners, drawing in relevant expertise and learning from places such as Western Australia we will develop a pipeline of properly costed, shaped and prioritised projects. This will build on existing work across Government such as our Infrastructure Investment Plan; the 'Strategic Investment Model' (SIM) work being led by the Scottish Offshore Wind Energy Council (SOWEC) and recent collaborative efforts across the Government and public sector partners to identify and align investment behind key ScotWind projects. As we iteratively develop the pipeline we |
Once relationships have been established, an annual meeting should be held to engage with these investors around the opportunities in this pipeline. Feedback from this event should result in regular refinement of the pipeline. |
As the investment pipeline develops we will hold annual meetings with investors to raise the profile of investment opportunities and understand their investment priorities and appetite. This intelligence will help us to refine the investment pipeline and assess broader investor sentiment towards Scotland and the key issues affecting investor views. |
ScotWind has the scale to attract global investor interest. A state sponsored conference, at the right time, should be considered to attract key international investors to Scotland. This would also serve to raise the profile of the broader investment landscape. |
It is already clear that ScotWind and associated infrastructure and manufacturing projects have the scale to attract global investor interest. In 2024 we will further develop the proposal to host a sponsored conference to help attract further interest |
Investors and market participants are concerned that the Scottish Government and the Crown Estate Scotland may find it difficult to secure all of the published commitments from developers and a continued focus will be required to ensure commitments are realised. |
The Supply Chain Development Statement (SCDS) process has been carefully designed by Crown Estate Scotland in respect to all applicable legal requirements, such as competition law and the EU-UK Trade and Cooperation Agreement. Developers are required to submit an initial SCDS as part of their ScotWind bid. The SCDS must by updated within 12 months of signing the Option Agreement and at least once every 3 years throughout the development phase of the project, from Option Agreement to Lease. Crown Estate Scotland has confirmed that applicants who do not fulfil their Supply Chain Development Statements will be subject to financial remedies. |
Investor Panel Recommendations |
Initial Scottish Government Response |
---|---|
Delivery |
|
The revised Scottish Government's investment objectives and associated pipeline should dictate |
As we review our approach with our |
An exercise needs to be undertaken to fully understand the financial and human resource currently committed across the Scottish Government and its agencies to attracting mobile capital and delivering core |
We agree that work needs to be done to understand the financial and human resource committed across Government and our agencies with a view to bringing greater coherence and focus to that resource and identifying capacity and capability gaps. A practical, early action of the Investment Strategy and Delivery Unit will be to map |
The roles and responsibilities of organisations and teams should be reviewed and made clear and an assessment of their capacity and expertise to unlock investment undertaken. Changes are likely to be required to meet the scale of the delivery challenge. |
We agree that change is likely to be required to meet the scale of the delivery challenge. Although public sector efforts to support investment in Scotland have shown individual successes they have also been relatively fragmented, with the relevant skills spread across a number of directorates in Scottish Government, agencies and local authorities. That system itself is shifting with the Scottish National Investment Bank now establishing its operations as both an investor and, over time, a centre of expertise for investment. The work we will carry out in response to recommendations 13-14 will help identify |
A mechanism needs to be put in place whereby the implications for investors and investor sentiment are taken into consideration when policy is formulated or legislation developed across all of Scottish Government. This also needs to apply to how policy is delivered. |
There is a strong read across between work being driven forward through the New Deal for Business Group (NDBG) and some of the Panel's recommendations on the Government's relationship with investors and if and how we consider the impact of policy and regulation on investment and investor sentiment. Working in alignment with work on NDBG we will put in place processes and practices at key stages of policy development and delivery to ensure implications for investors and investor sentiment are considered. This will include early engagement with the investment community on key policy proposals. |
The implementation of the policy within the National Planning Framework 4 of a requirement for planning authorities to give significant weight to the global climate emergency when considering development proposals should be monitored to see if it results in a faster, more certain planning process |
We published an updated version of the NPF4 delivery programme this autumn which set out early but significant progress towards delivery of the policies and proposals set out in the framework. The delivery programme includes our commitment to produce 'planning and climate change guidance', which will support the practical application of the new policy, We are currently developing a fuller monitoring programme, and have discussed it with the High Level Group on Planning Performance which we jointly chair with CoSLA. In the meantime, we are working closely with planning authorities and stakeholders to assess how policies are being applied in practice. Where issues have arisen we have met with Heads of Planning Scotland and others to share views and experiences and encourage a consistent approach. Alongside this, we have established the Planning, Infrastructure and Place Advisory Group (which we jointly chair with the Work is also ongoing, in collaboration with a wide range of stakeholders, to tackle the challenge of resourcing the planning system. |
Building on the recommendations of the UK Electricity Networks Commissioner Report, the Scottish Government should make representations to the UK Government on the development of a master plan for the implementation of the grid expansion necessary to meet the needs of ScotWind. |
The Scottish Government continues to press the UK Government to ensure investment in our grid infrastructure happens at the pace and scale required to enable the full use of current and future renewables capacity, including from ScotWind. We also consistently urge the Electricity System Operator (ESO) to explore all avenues to accelerate the timelines for ScotWind projects. The Connections Action Plan published jointly by the UK Government and Ofgem is a step forward in this regard. The UK Government's response to the recommendations of the UK Electricity Networks Commissioner needs to be implemented effectively and urgently. We are carefully considering the UK Government's response, including emphasising the need for the Scottish Government to contribute to the Strategic Spatial Energy Plan, and we continue to work with the UK Government to ensure the wider proposals are fit for purpose. |
A plan needs to be developed for the scaling up of a floating offshore wind pilot scheme |
ScotWind is the world's largest commercial round for floating offshore wind and puts Scotland at the forefront of offshore wind development globally. Scotland's innovation sector is responding to this challenge. For example, in early 2024 the National Floating Wind Innovation Centre (FLOWIC) located within Scotland's Energy Transition Zone will become the UK's first testing and demonstration facility dedicated purely to the development of floating offshore wind technology. It will play a vital role in fast tracking the development of technical components critical to successful large-scale roll out of floating wind. The SOWEC Supply Chain and Clusters working group will support this activity with the creation of a Scottish Floating Offshore Wind supply chain that develops and grows alongside the committed investment in the two Green Freeports. It will leverage innovation opportunity from the INTOG leasing round to ensure maximum benefit to Scottish supply chain and the pipeline of projects which will rely on it. |
The Scottish Government should evaluate the economic viability of pipeline exports |
A wide range of work is underway across |
Public financial resources and policy should focus on the use of green hydrogen as an enabler for industrial decarbonisation. |
Green hydrogen can be useful across a We are confident that we have enough energy resources around us in Scotland to supply our own domestic demand for hydrogen and service export markets as they develop. We have recently established the Scottish Hydrogen Industry forum chaired by Energy Minister Gillian Martin with a remit to help: drive forward the hydrogen economy in Scotland collaboratively; ensure Scottish Government policy and action remains responsive to technological and market developments; and maximise the decarbonisation and economic benefit for businesses and communities. |
Public sector connection to heat grids should be mandatory to provide the right demand signal for private investment into heat sources. Extending this regulation to new commercial real estate and large-scale housing development should be accelerated. |
We are exploring further legislation to encourage certain buildings, including public sector buildings, commercial buildings and new buildings, to connect to heat networks where they can de-risk investment in these schemes. We will set out further detail on |
Private investment into heat sources can be accelerated by creating a viable margin for district heating. This can be facilitated by reducing upfront costs, such as planning, and focusing subsidies on the market for renewable heat. |
We have established Scotland's Heat Network Fund to provide grant funding to low carbon heat networks. All local authorities are developing their Local Heat and Energy Efficiency Strategies (LHEES) – this will enable engagement with developers about opportunities and how these can be best We have developed resources to support local authorities to understand different ways that they can engage with and contract with heat network developers. LHEES will also enable us to work with Local Authorities and developers to better understand barriers in local areas and how these could be overcome, including through Scottish Government using levers it has available to it. |
For institutional investment at scale to be attracted to the residential housing sector to help finance its transition to net zero, greater clarity as to the stability and quantum of returns is required. |
The Green Heat Finance Taskforce recently published Part 1 of its work. This sets out the current status of private finance markets for building retrofit including installation of clean heating. It also highlights barriers to the growth of private finance provision and notes opportunities to expand the range of products available to individuals and businesses to help finance the upfront costs of work. It also provides an overview of the current products on the market which consumers can access. Part 2 will look at aggregated funding models and will include consideration of how investor returns could be structured. We are also working with a range of different parties such as the Scottish National Investment Bank, Scottish Futures Trust, UK Infrastructure Bank and the investment community to identify how pathfinders and pilots could be established to provide investors with confidence of what their returns could be. The Panel's advice and assessment is welcome, and moving forward with work to secure investment for social housing and net zero policies we will take account of investor risk appetite and expectations relating to stability and Return on Investment. |
The Scottish Government should consider the recommendations of the Offshore Wind Champion and implement those that are within its devolved powers, including ensuring there is adequate resource for the Marine Directorate of Scottish Government and NatureScot to meet responsibilities in ScotWind. |
The Scottish Government welcomed the recommendations of the Offshore Wind Champion (Tim Pick) and is taking steps to implement those recommendations that lie within devolved powers, working alongside Crown Estate Scotland, and our enterprise and skills agencies. The report also included a wide range of recommendations for UK Government. It is critical that these, especially recommendations on the removal of grid constraints and Contract for Difference (CfD) reform are delivered quickly. We have identified resource requirements for offshore planning and consenting work and will seek to ensure both Scottish Government and agencies are appropriately resourced. A streamlining project to consider and implement improvements to facilitate marine licencing and consenting is ongoing. We also continue to work with UK government officials on implementing changes brought about through the Energy Act. |
The Scottish Government should improve engagement between the newly established Offshore Wind Directorate and the industry to ensure a focus on maximising opportunities around offshore wind operations and maintenance. |
The Scottish Government agrees that there are significant opportunities in offshore wind operations and maintenance. The Offshore Wind Directorate was established in April and we have engaged with the industry via roundtables, individual meetings and supporting sector conferences. We will continue to work across Government and with our enterprise and skills agencies and the Scottish National Investment Bank to ensure the opportunities of offshore wind operations and maintenance are maximised. |
The Scottish National Investment Bank should be able to provide guarantees and underwriting at scale in line with the capabilities of many other investment or development banks. |
We agree with the principle of this recommendation and will actively consider it as part of wider work on the future development of the Bank. The Bank makes investments in line with its investment strategy, business plan and within its delegated authorities, and in the ordinary course of business the Bank may offer guarantees or indemnities within those limits. It hasn't chosen to use guarantees to date, preferring to use debt and equity instruments. The Bank's current delegated authority for the use of guarantees is £2.5m. This limit recognises the requirements of the Scottish Public Finance Manual and the terms of the Written Agreement between Scottish Government and the Finance and Public Administration Committee, and reflects the close scrutiny the Scottish Parliament expects to have over guarantees and other contingent liabilities. The Scottish Government has granted a number of guarantees that exceed this limit (which have been granted subject to Parliamentary approval), and we recognise that to meet the scale of the net zero investment challenge the Government may need to consider underwriting at a commensurate scale. We will: work with the Bank and the Investor Panel to better understand the opportunities that guarantees could unlock and the scale of potential guarantees that might be needed; understand the value for money and potential budgetary implications for the Bank and Scottish Government of the use
We will also work with other development banks that have the powers to offer guarantees, in particular the UK Infrastructure Bank, to ensure parties work together to unlock investment opportunities. |
The Scottish National Investment Bank should invest pre-emptively in the supply chain for ScotWind, complementing the tax incentives offered by the Green Free Ports. |
The Bank has a pivotal role to play in being a catalytic investor in the infrastructure and supply chain necessary to deliver maximum economic benefit from ScotWind and, in line with Recommendation 12, securing the public commitments from developers. It has, for example, already invested in Aberdeen Harbour and North Star Renewables and will be a key delivery partner, along with our enterprise agencies, for supporting ScotWind. |
Public leadership needs to continue to upskill to be able to act as effective counterparties to major investors and must commit to continually deepening this knowledge and understanding. These skills need to be learned from those with proven expertise and who embody international best practice. |
We will develop and deliver a programme |
Attracting mobile capital is a specialist area and the Scottish Government does not have the resources to build every capability to an adequate standard itself. Using external commercial specialists might prove to be a better value proposition. |
We recognise that attracting mobile capital is a specialist area. In line with Recommendations 13-15 and 29, there are relevant skills and expertise within Government and across our agencies which the Investment Strategy and Delivery Unit will seek to draw together in However, in some areas and for some types of work we agree that it will make more sense and be a better value proposition to bring in external expertise than seek to develop capability within Government or our agencies. Where that is done, skills development and knowledge transfer will be an important part of the contractual arrangement. |
A culture needs to develop that is rigorously focused on outputs, not inputs or on process management. |
The Scottish Government, its agencies and partners, including investors must each play their part in changing the culture of the system in which we operate. We must hold each other accountable for change which makes a positive, measurable and lasting impact as we transition to net zero. We will seek formal and informal feedback from investors on our changing approach. Across the public sector in Scotland we stand ready to challenge our ways of working to secure a more productive and effective |