Scottish Transport Statistics No 29: 2010 Edition

Has figures on (e.g.) road vehicles, traffic, accidents, bus and rail passengers, road and rail freight, air and water transport, finance, personal travel and international comparisons.


Table 7.10 ScotRail services: arrival times at final destinations 1

1999-00

2000-01

2001-02

2002-03

2003-04

2004-05

2005-06

2006-07

2007-08

2008-09

2009-10

percentages

Total within 5 minutes

92.1

86.8

82.2

82.1

85.5

83.1

85.8

88.8

90.6

90.6

90.7

Total within 10 minutes

95.9

93.2

91.6

91.8

94.3

93.0

94.4

95.2

95.9

96.1

95.8

Total within 20 minutes

97.6

96.2

95.8

95.7

97.5

96.8

97.4

97.3

97.5

97.7

97.3

20 minutes and over 2

1.3

2.0

2.3

2.7

1.7

2.1

1.5

1.5

1.4

1.4

1.7

Cancelled 3

1.1

1.8

1.9

1.7

0.8

1.1

1.1

1.2

1.1

0.9

1.0

thousands

Number of trains due to be run 4

646

647

603

599

662

667

691

693

706

697

715

Source: ORR - Not National Statistics
1 For example, Total within 5 minutes gives the percentage which were no more than 4 minutes and 59 seconds late
2 Includes part-cancelled trains (those which failed to reach their final destination but ran at least half their planned mileage)
3 Includes trains which ran less than half their planned mileage
4 As in the planned timetable for the day. This may differ from the published timetable due to ( e.g.) engineering works, floods, etc.

Back to top