Table 7.10 ScotRail services: arrival times at final destinations 1
1999-00 |
2000-01 |
2001-02 |
2002-03 |
2003-04 |
2004-05 |
2005-06 |
2006-07 |
2007-08 |
2008-09 |
2009-10 |
|
---|---|---|---|---|---|---|---|---|---|---|---|
percentages |
|||||||||||
Total within 5 minutes |
92.1 |
86.8 |
82.2 |
82.1 |
85.5 |
83.1 |
85.8 |
88.8 |
90.6 |
90.6 |
90.7 |
Total within 10 minutes |
95.9 |
93.2 |
91.6 |
91.8 |
94.3 |
93.0 |
94.4 |
95.2 |
95.9 |
96.1 |
95.8 |
Total within 20 minutes |
97.6 |
96.2 |
95.8 |
95.7 |
97.5 |
96.8 |
97.4 |
97.3 |
97.5 |
97.7 |
97.3 |
20 minutes and over 2 |
1.3 |
2.0 |
2.3 |
2.7 |
1.7 |
2.1 |
1.5 |
1.5 |
1.4 |
1.4 |
1.7 |
Cancelled 3 |
1.1 |
1.8 |
1.9 |
1.7 |
0.8 |
1.1 |
1.1 |
1.2 |
1.1 |
0.9 |
1.0 |
thousands |
|||||||||||
Number of trains due to be run 4 |
646 |
647 |
603 |
599 |
662 |
667 |
691 |
693 |
706 |
697 |
715 |
Source: ORR - Not National Statistics
1 For example, Total within 5 minutes gives the percentage which were no more than 4 minutes and 59 seconds late
2 Includes part-cancelled trains (those which failed to reach their final destination but ran at least half their planned mileage)
3 Includes trains which ran less than half their planned mileage
4 As in the planned timetable for the day. This may differ from the published timetable due to ( e.g.) engineering works, floods, etc.
There is a problem