Project Title: Dumbarton Road / Stone Repairs and Insulation
Project Organisation: Dalmuir Park Housing Association
Technology Type(s): EWI and IWI
Location(s): Dalmuir, West Dunbartonshire Council
Grant Value: £278,054
Completion Date: March 2024
Project Headline: Fabric First approach to 31 pre-1919 tenements in Dalmuir
Project Description:
This project provided fabric first energy efficiency measures to 31 flats in Dalmuir, which were flats in pre-1919 tenement blocks. All of the targeted properties were previously poorly insulated and consequently expensive to heat with EPC ratings of D. After installation of the measures, the aim was to achieve an EPC rating of B.
The measures which were installed included EWI and IWI. The entire building was enveloped and the insulation which also covered the close walls. The method of installation meant that the properties could be upgraded without the need for decanting tenants. The project was intended to reduce condensation, heat loss and CO2 emissions as well as reduce heating bills for tenants.