Publication - Corporate report
Scottish Budget 2023 to 2024: spring budget revision
Supporting document to the Budget (Scotland) Act 2023 Amendment Regulations 2023. Provides details of Level 2 and 3 budgets.
Transport, Net Zero and Just Transition
Total Changes for the Spring Budget Revision | Operating | Capital | Total | |
---|---|---|---|---|
£m | £m | £m | ||
Total Budget following the Autumn Budget Revision | 3,727.653 | 580.167 | 4,307.820 | |
Changes Proposed | Funding Changes | -210.229 | -7.662 | -217.891 |
Technical Adjustments | 15.871 | -13.450 | 2.421 | |
Net Whitehall Transfers | 0.000 | 0.000 | 0.000 | |
Net Transfers within Scottish Block | -23.680 | 0.000 | -23.680 | |
Total changes proposed | -218.038 | -21.112 | -239.150 | |
Proposed Budget following Spring Budget Revisions | 3,509.615 | 559.055 | 4,068.670 | |
Expenditure Limit | Heat in Buildings/Energy Efficiency | 243.265 | 19.000 | 262.265 |
Rail Services | 1,430.777 | 0.000 | 1,430.777 | |
Concessionary Fares and Bus Services | 396.051 | 0.000 | 396.051 | |
Active Travel, Low Carbon and Other Transport | 217.126 | 0.000 | 217.126 | |
Motorways and Trunk Roads | 483.494 | 180.341 | 663.835 | |
Ferry Services | 324.154 | 69.100 | 393.254 | |
Air Services | 68.877 | 0.000 | 68.877 | |
Environmental Services | 211.053 | -4.038 | 207.015 | |
Climate Change and Land Managers Renewables Fund | 46.569 | 1.000 | 47.569 | |
Scottish Water | -104.824 | 290.652 | 185.828 | |
Green Economy | 5.070 | 0.000 | 5.070 | |
NZJT Central Government Grants to Local Authorities | 83.429 | 0.000 | 83.429 | |
Total Expenditure Limit | 3,405.042 | 556.055 | 3,961.097 | |
UK Funded AME | UK Funded AME: Active Travel, Low Carbon and Other Transport | 0.000 | 3.000 | 3.000 |
Total UK Funded AME | 0.000 | 3.000 | 3.000 | |
Other Expenditure | Motorways and Trunk Roads PPP/PFI | 104.573 | 0.000 | 104.573 |
Total Other Expenditure | 104.573 | 0.000 | 104.573 | |
Total Budget | 3,509.615 | 559.055 | 4,068.670 | |
Total Limit on Income (accruing resources) | 600.000 |
Schedule 3.1 Heat in Buildings/Energy Efficiency
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Original Budget | 347.636 | 36.000 | 383.636 |
ABR changes | -21.466 | 0.000 | -21.466 |
ABR Budget | 326.170 | 36.000 | 362.170 |
Proposed changes | -82.905 | -17.000 | -99.905 |
SBR Proposed Budget | 243.265 | 19.000 | 262.265 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Release of emerging and planned underspend to support priorities and the costs of inflation and public sector pay deals | -71.500 | -16.000 | -87.500 |
Transfer of CARES programme to Energy | -10.200 | 0.000 | -10.200 |
Transfer to Climate Change in relation to Social Investment Scotland | 0.000 | -1.000 | -1.000 |
Miscellaneous minor transfers | -1.205 | 0.000 | -1.205 |
-82.905 | -17.000 | -99.905 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Gross Expenditure | 243.265 | 19.000 | 262.265 |
Less: Retained Income | 0.000 | 0.000 | 0.000 |
Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
243.265 | 19.000 | 262.265 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Heat in Buildings/ Energy Efficiency | 243.265 | 19.000 | 262.265 |
Net Expenditure | 243.265 | 19.000 | 262.265 |
Schedule 3.2 Rail Services
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Original Budget | 1,418.262 | 0.000 | 1,418.262 |
ABR changes | 13.000 | 0.000 | 13.000 |
ABR Budget | 1,431.262 | 0.000 | 1,431.262 |
Proposed changes | -0.485 | 0.000 | -0.485 |
SBR Proposed Budget | 1,430.777 | 0.000 | 1,430.777 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Transfer to support higher demand within Ferry Services | -4.179 | 0.000 | -4.179 |
Transfer to support the Active Travel objectives of the new Leven Rail Line | 3.544 | 0.000 | 3.544 |
Miscellaneous minor transfers | 0.150 | 0.000 | 0.150 |
-0.485 | 0.000 | -0.485 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Gross Expenditure | 1,430.777 | 0.000 | 1,430.777 |
Less: Retained Income | 0.000 | 0.000 | 0.000 |
Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
1,430.777 | 0.000 | 1,430.777 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Rail Franchise | 838.093 | 0.000 | 838.093 |
Rail Infrastructure | 420.325 | 0.000 | 420.325 |
Major Public Transport Projects | 172.359 | 0.000 | 172.359 |
Rail Development | 0.000 | 0.000 | 0.000 |
Net Expenditure | 1,430.777 | 0.000 | 1,430.777 |
Schedule 3.3 Concessionary Fares & Bus Services
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Original Budget | 425.693 | 0.000 | 425.693 |
ABR changes | -0.500 | 0.000 | -0.500 |
ABR Budget | 425.193 | 0.000 | 425.193 |
Proposed changes | -29.142 | 0.000 | -29.142 |
SBR Proposed Budget | 396.051 | 0.000 | 396.051 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Resulting balance due to lower than forecast demand transferred to support higher demand within Ferry Services | -22.167 | 0.000 | -22.167 |
Annual transfer to Local Government to support the Community Bus Fund | -5.000 | 0.000 | -5.000 |
Resulting balance due to lower than forecast demand transferred to Motorways and Trunk Roads to support remedial works following extreme weather event | -2.333 | 0.000 | -2.333 |
Miscellaneous minor transfers | 0.358 | 0.000 | 0.358 |
-29.142 | 0.000 | -29.142 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Gross Expenditure | 396.051 | 0.000 | 396.051 |
Less: Retained Income | 0.000 | 0.000 | 0.000 |
Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
396.051 | 0.000 | 396.051 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Concessionary Fares | 360.101 | 0.000 | 360.101 |
Support for Bus Services | 32.508 | 0.000 | 32.508 |
Smartcard Programme | 3.442 | 0.000 | 3.442 |
Net Expenditure | 396.051 | 0.000 | 396.051 |
Schedule 3.4 Active Travel, low Carbon and Other Transport
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Original Budget | 345.184 | 1.150 | 346.334 |
ABR changes | -28.639 | 0.000 | -28.639 |
ABR Budget | 316.545 | 1.150 | 317.695 |
Proposed changes | -99.419 | 1.850 | -97.569 |
SBR Proposed Budget | 217.126 | 3.000 | 220.126 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Release of emerging and planned underspend to support priorities and the costs of inflation and public sector pay deals | -82.890 | -1.150 | -84.040 |
Balance resulting from lower than forecast demand reallocated to Motorways and Trunk Roads to support remedial works following extreme weather event | -7.270 | 0.000 | -7.270 |
Transfer to Scottish Enterprise to support the development of battery and hydrogen buses | -5.000 | 0.000 | -5.000 |
Transfer to Rail Services to support the Active Travel objectives of the new Leven Rail Line | -3.544 | 0.000 | -3.544 |
Technical Adjustment in relation to IFRS16 Leases | 1.473 | 3.000 | 4.473 |
Miscellaneous minor transfers | -2.188 | 0.000 | -2.188 |
-99.419 | 1.850 | -97.569 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Gross Expenditure | 217.126 | 3.000 | 220.126 |
Less: Retained Income | 0.000 | 0.000 | 0.000 |
Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
217.126 | 3.000 | 220.126 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Support for Active Travel | 108.120 | 0.000 | 108.120 |
Future Transport Fund | 32.289 | 0.000 | 32.289 |
Agency Administration Costs | 26.855 | 3.000 | 29.855 |
Scottish Canals | 23.492 | 0.000 | 23.492 |
Transport Strategy & Innovation | 22.240 | 0.000 | 22.240 |
Support for Sustainable Travel | 3.201 | 0.000 | 3.201 |
Support for Freight Industry | 0.679 | 0.000 | 0.679 |
Edinburgh Tram Enquiry | 0.250 | 0.000 | 0.250 |
Strategic Transport Projects Review | 0.000 | 0.000 | 0.000 |
Net Expenditure | 217.126 | 3.000 | 220.126 |
Schedule 3.5 Motorways and Trunk Roads
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Original Budget | 555.228 | 220.541 | 775.769 |
ABR changes | -1.150 | -0.400 | -1.550 |
ABR Budget | 554.078 | 220.141 | 774.219 |
Proposed changes | 33.989 | -39.800 | -5.811 |
SBR Proposed Budget | 588.067 | 180.341 | 768.408 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Technical budget adjustment | 24.600 | -24.600 | 0.000 |
Release of emerging and planned underspend to support priorities and the costs of inflation | 0.000 | -15.800 | -15.800 |
Balance resulting from lower than forecast demand reallocated from Active Travel, Low Carbon and Other Transport Policy to support remedial works following extreme weather event | 7.270 | 0.000 | 7.270 |
Resulting balance due to lower than forecast demand transferred from Concessionary Fares & Bus Services to support remedial works following extreme weather event | 2.333 | 0.000 | 2.333 |
Miscellaneous minor transfers | -0.214 | 0.600 | 0.386 |
33.989 | -39.800 | -5.811 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Gross Expenditure | 588.067 | 180.341 | 768.408 |
Less: Retained Income | 0.000 | 0.000 | 0.000 |
Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
588.067 | 180.341 | 768.408 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Roads Depreciation | 168.600 | 0.000 | 168.600 |
Capital Land & Works | 0.000 | 81.391 | 81.391 |
Routine & Winter Maintenance | 125.717 | 0.000 | 125.717 |
Motorway & Trunk Roads PPP/PFI | 104.573 | 0.000 | 104.573 |
Structural Repairs | 0.000 | 98.650 | 98.650 |
Network Strengthening | 101.100 | 0.000 | 101.100 |
Roads Improvements | 44.128 | 0.000 | 44.128 |
M&T Other Current Expenditure | 21.542 | 0.000 | 21.542 |
Road Safety | 13.783 | 0.000 | 13.783 |
Forth & Tay Bridge Authorities | 8.142 | 0.000 | 8.142 |
Transport Information | 0.482 | 0.000 | 0.482 |
Queensferry Crossing | 0.000 | 0.300 | 0.300 |
Net Expenditure | 588.067 | 180.341 | 768.408 |
Schedule 3.6 Ferry Services
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Original Budget | 329.870 | 110.100 | 439.970 |
ABR changes | 1.938 | 0.000 | 1.938 |
ABR Budget | 331.808 | 110.100 | 441.908 |
Proposed changes | -7.654 | -41.000 | -48.654 |
SBR Proposed Budget | 324.154 | 69.100 | 393.254 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Release of emerging and planned underspend to support priorities and the costs of inflation and public sector pay deals | -34.000 | -41.000 | -75.000 |
Resulting balance due to lower than forecast demand transferred from Concessionary Fares & Bus Services to support higher demand within Ferry Services | 22.167 | 0.000 | 22.167 |
Transfer from Rail Services to support higher demand within Ferry Services | 4.179 | 0.000 | 4.179 |
-7.654 | -41.000 | -48.654 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Gross Expenditure | 324.154 | 69.100 | 393.254 |
Less: Retained Income | 0.000 | 0.000 | 0.000 |
Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
324.154 | 69.100 | 393.254 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Support for Ferry Services | 279.254 | 0.000 | 279.254 |
Vessels and Piers | 44.900 | 69.100 | 114.000 |
Net Expenditure | 324.154 | 69.100 | 393.254 |
Schedule 3.7 Air Services
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Original Budget | 73.977 | 0.000 | 73.977 |
ABR changes | 0.500 | 0.000 | 0.500 |
ABR Budget | 74.477 | 0.000 | 74.477 |
Proposed changes | -5.600 | 0.000 | -5.600 |
SBR Proposed Budget | 68.877 | 0.000 | 68.877 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Release of emerging and planned underspend to support priorities and the costs of inflation and public sector pay deals | -5.200 | 0.000 | -5.200 |
Miscellaneous minor transfers | -0.400 | 0.000 | -0.400 |
-5.600 | 0.000 | -5.600 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Gross Expenditure | 68.877 | 0.000 | 68.877 |
Less: Retained Income | 0.000 | 0.000 | 0.000 |
Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
68.877 | 0.000 | 68.877 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Highlands & Islands Airports Limited | 54.287 | 0.000 | 54.287 |
Support for Air Services | 14.590 | 0.000 | 14.590 |
Support for Prestwick Airport | 0.000 | 0.000 | 0.000 |
Net Expenditure | 68.877 | 0.000 | 68.877 |
Schedule 3.8 Environmental Services
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Original Budget | 209.626 | 0.000 | 209.626 |
ABR changes | 9.860 | 0.000 | 9.860 |
ABR Budget | 219.486 | 0.000 | 219.486 |
Proposed changes | -8.433 | -4.038 | -12.471 |
SBR Proposed Budget | 211.053 | -4.038 | 207.015 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Release of emerging and planned underspend to support priorities and the costs of inflation and public sector pay deals | -9.245 | 0.000 | -9.245 |
Repayment of loan from Zero Waste Scotland | 0.000 | -4.038 | -4.038 |
Transfer to Local Government to support the Storm Babet recovery fund | -1.000 | 0.000 | -1.000 |
Miscellaneous minor transfers | 1.812 | 0.000 | 1.812 |
-8.433 | -4.038 | -12.471 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Gross Expenditure | 211.053 | -4.038 | 207.015 |
Less: Retained Income | 0.000 | 0.000 | 0.000 |
Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
211.053 | -4.038 | 207.015 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
NatureScot (SNH) | 77.563 | 0.000 | 77.563 |
Zero Waste | 46.457 | -4.038 | 42.419 |
Scottish Environment Protection Agency | 47.865 | 0.000 | 47.865 |
National Parks | 25.499 | 0.000 | 25.499 |
Nature Restoration | 5.151 | 0.000 | 5.151 |
Environmental Quality | 8.518 | 0.000 | 8.518 |
Net Expenditure | 211.053 | -4.038 | 207.015 |
Schedule 3.9 Climate Change and Land Managers Renewables Fund
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Original Budget | 56.363 | 25.000 | 81.363 |
ABR changes | -1.252 | -25.000 | -26.252 |
ABR Budget | 55.111 | 0.000 | 55.111 |
Proposed changes | -8.542 | 1.000 | -7.542 |
SBR Proposed Budget | 46.569 | 1.000 | 47.569 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Release of emerging and planned underspend to support priorities and the costs of inflation and public sector pay deals | -8.305 | 0.000 | -8.305 |
Transfer from Energy Efficiency in relation to Social Investment Scotland | 0.000 | 1.000 | 1.000 |
Miscellaneous minor transfers | -0.237 | 0.000 | -0.237 |
-8.542 | 1.000 | -7.542 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Gross Expenditure | 46.569 | 1.000 | 47.569 |
Less: Retained Income | 0.000 | 0.000 | 0.000 |
Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
46.569 | 1.000 | 47.569 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Climate Change - Policy Development & Implementation | 1.303 | 0.000 | 1.303 |
Climate Change and Just Transition Fund | 45.266 | 1.000 | 46.266 |
Land Managers Renewables Fund | 0.000 | 0.000 | 0.000 |
Net Expenditure | 46.569 | 1.000 | 47.569 |
Schedule 3.10 Scottish Water
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Original Budget | -94.095 | 212.776 | 118.681 |
ABR changes | -0.882 | 0.000 | -0.882 |
ABR Budget | -94.977 | 212.776 | 117.799 |
Proposed changes | -9.847 | 77.876 | 68.029 |
SBR Proposed Budget | -104.824 | 290.652 | 185.828 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Technical budget adjustment for voted loans | 0.000 | 77.876 | 77.876 |
Release of emerging and planned underspend to support priorities and the costs of inflation and public sector pay deals | -9.855 | 0.000 | -9.855 |
Miscellaneous minor transfers | 0.008 | 0.000 | 0.008 |
-9.847 | 77.876 | 68.029 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Gross Expenditure | -104.824 | 290.652 | 185.828 |
Less: Retained Income | 0.000 | 0.000 | 0.000 |
Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
-104.824 | 290.652 | 185.828 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Drinking Water Quality Regulator | 0.307 | 0.000 | 0.307 |
Hydro Nation | 2.582 | 0.000 | 2.582 |
Interest on Voted Loans | -114.500 | 0.000 | -114.500 |
Private Water | 6.787 | 0.000 | 6.787 |
Voted Loans | 0.000 | 290.652 | 290.652 |
Net Expenditure | -104.824 | 290.652 | 185.828 |
Schedule 3.11 Green Economy
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Original Budget | 5.070 | 0.000 | 5.070 |
ABR changes | 0.000 | 0.000 | 0.000 |
ABR Budget | 5.070 | 0.000 | 5.070 |
Proposed changes | 0.000 | 0.000 | 0.000 |
SBR Proposed Budget | 5.070 | 0.000 | 5.070 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Miscellaneous minor transfers | 0.000 | 0.000 | 0.000 |
0.000 | 0.000 | 0.000 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Gross Expenditure | 5.070 | 0.000 | 5.070 |
Less: Retained Income | 0.000 | 0.000 | 0.000 |
Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
5.070 | 0.000 | 5.070 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Green Economy | 5.070 | 0.000 | 5.070 |
Net Expenditure | 5.070 | 0.000 | 5.070 |
Schedule 3.12 NZJT Central Government Grants to Local Authorities
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Original Budget | 58.454 | 0.000 | 58.454 |
ABR changes | 24.975 | 0.000 | 24.975 |
ABR Budget | 83.429 | 0.000 | 83.429 |
Proposed changes | 0.000 | 0.000 | 0.000 |
SBR Proposed Budget | 83.429 | 0.000 | 83.429 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Miscellaneous minor transfers | 0.000 | 0.000 | 0.000 |
0.000 | 0.000 | 0.000 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Gross Expenditure | 83.429 | 0.000 | 83.429 |
Less: Retained Income | 0.000 | 0.000 | 0.000 |
Capital Receipts Applied | 0.000 | 0.000 | 0.000 |
83.429 | 0.000 | 83.429 |
Proposed Changes | Operating | Capital | Total |
---|---|---|---|
£m | £m | £m | |
Cycling, Walking & Safer Routes | 35.000 | 0.000 | 35.000 |
Heat Networks Early Adopters Challenge Fund | 0.000 | 0.000 | 0.000 |
Regional Transport Partnership | 15.327 | 0.000 | 15.327 |
Support for Inter-Island Ferries | 33.102 | 0.000 | 33.102 |
Net Expenditure | 83.429 | 0.000 | 83.429 |