Publication - Independent report
Ultra-deep water port: feasibility study
Report compiled by Ernst & Young following their feasibility study looking at the most cost effective locations for an ultra-deep water port in the UK.
Appendix H: List of candidate platforms
ID | Country | Name | Location (blocks) | Latitude | Longitude | Water depth (m) | Operator | Production start | Current Status | Primary production | Category | Function | Weight sub-structure (tonnes) | Weight topside (tonnes) | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
UK677 | United Kingdom | Alba northern | 16/26 | 58.058692 | 1.081275 | 140 | Chevron | 1994 | Operational | Oil | Fixed steel | Above water production | 17000 | 25534 | |
UK678 | United Kingdom | Alwyn north NAA | 3/9 | 60.809278 | 1.683611 | 125 | Total E&P | 1987 | Operational | Oil | Fixed steel | Above water production | 18500 | 21400 | |
UK679 | United Kingdom | Alwyn north NAB | 3/9 | 60.810117 | 1.743450 | 125 | Total E&P | 1987 | Operational | Oil | Fixed steel | Above water production | 14500 | 15000 | |
UK680 | United Kingdom | Andrew | 16/28 | 58.047531 | 1.404322 | 116 | BP | 1996 | Operational | Oil | Fixed steel | Above water production | 6500 | 10200 | |
UK682 | United Kingdom | Armada Platform | 22/5 | 57.957433 | 1.845906 | 88 | BG | 1997 | Operational | Gas | Fixed steel | Above water production | 6120 | 10548 | |
UK683 | United Kingdom | Auk A | 30/16 | 56.403833 | 2.182500 | 84 | Repsol-Sinopec | 1975 | Operational | Oil | Fixed steel | Above water production | 3414 | 8093 | |
UK531 | United Kingdom | Beatrice AD | 11/30 | 58.115303 | -3.085969 | 45 | Repsol-Sinopec | 1981 | Operational | Oil | Fixed steel | Above water production | 3225 | 8167 | |
UK752 | United Kingdom | Beryl A | 9/13 | 59.545686 | 1.537903 | 119 | Apache Beryl | 1976 | Operational | Oil | Gravity-based concrete | Above water production | 200000 | 32500 | |
UK685 | United Kingdom | Beryl B | 9/13 | 59.610342 | 1.512742 | 119 | Apache Beryl | 1976 | Operational | Oil | Fixed steel | Above water production | 13250 | 21800 | |
UK687 | United Kingdom | Brae A | 16/7 | 58.692778 | 1.281944 | 112 | Marathon | 1983 | Operational | Oil | Fixed steel | Above water production | 18600 | 38000 | |
UK689 | United Kingdom | Brae B | 16/7a | 58.792364 | 1.347415 | 102 | Marathon | 1988 | Operational | Condensate | Fixed steel | Above water production | 18900 | 42000 | |
UK690 | United Kingdom | Brae east | 16/03a | 58.794318 | 1.350303 | 113 | Marathon | 1993 | Operational | Condensate | Fixed steel | Above water production | 9308 | 18500 | |
UK754 | United Kingdom | Brent Charlie | 211/29 | 61.206256 | 1.750936 | 142 | Shell | 1976 | Operational | Oil | Gravity-based concrete | Above water production | 287542 | 29846 | |
UK693 | United Kingdom | Brittania Platform | 16/26 | 58.048631 | 1.138747 | 148 | ConocoPhillips | 1998 | Operational | Condensate | Fixed steel | Above water production | 20000 | 18500 | |
UK695 | United Kingdom | Bruce PUQ | 9/8a | 59.742778 | 1.673333 | 118 | BP | 1993 | Operational | Condensate | Fixed steel | Above water production | 9600 | 20339 | |
UK975 | United Kingdom | Buzzard Production Platform | 20/06 | 57.814200 | 0.974331 | 97 | Nexen | 2006 | Operational | Oil | Fixed steel | Above water production | 5569 | 10950 | |
UK976 | United Kingdom | Buzzard Utilities Platform | 20/06 | 57.813522 | 0.975981 | 97 | Nexen | 2006 | Operational | Oil | Fixed steel | Above water production | 5130 | 9651 | |
UK933 | United Kingdom | Clair Phase 1 Platform | 206/8 | 60.698333 | 2.548333 | 130 | BP | 2004 | Operational | Oil | Fixed steel | Above water production | 9010 | 16360 | |
UK1155 | United Kingdom | Clair Ridge DP Platform | 206/8a | 60.763167 | 2.592472 | 141 | BP | 2016 | Operational | Oil | Fixed steel | Above water production | 19742 | 27776 | |
UK1156 | United Kingdom | Clair Ridge QU | 206/8a | 139 | BP | 2016 | Operational | Oil | Fixed steel | Above water production | 8705 | 16122 | |||
UK697 | United Kingdom | Claymore A | 14/19 | 58.449318 | -0.253607 | 111 | Repsol-Sinopec | 1977 | Operational | Oil | Fixed steel | Above water production | 17000 | 18000 | |
UK699 | United Kingdom | Clyde | 30/17b | 56.452778 | 2.288333 | 81 | Repsol-Sinopec | 1987 | Operational | Oil | Fixed steel | Above water production | 10400 | 17900 | |
UK700 | United Kingdom | Cormorant north | 211/21a | 61.240556 | 1.149444 | 160 | TAQA | 1982 | Operational | Oil | Fixed steel | Above water production | 20052 | 15290 | |
UK756 | United Kingdom | Cormorant south A | 211/26a | 61.125000 | 1.127778 | 155 | TAQA | 1979 | Operational | Oil | Gravity-based concrete | Above water production | 294655 | 25600 | |
UK548 | United Kingdom | Douglas DP | 110/13b | 53.571972 | 3.684139 | 33 | ENI | 1996 | Operational | Oil | Fixed steel | Above water production | 2500 | 9100 | |
UK702 | United Kingdom | Dunbar | 3/14a | 60.810117 | 1.735242 | 127 | Total E&P | 1994 | Operational | Oil | Fixed steel | Above water production | 9500 | 9500 | |
UK757 | United Kingdom | Dunlin A | 211/23a | 61.274289 | 1.595847 | 151 | Fairfield | 1978 | Closed down | Oil | Gravity-based concrete | Above water production | 228611 | 19350 | |
UK703 | United Kingdom | Eider | 211/16a | 61.423056 | 1.262222 | 159 | Taqa Bratani | 1988 | Operational | Oil | Fixed steel | Above water production | 17100 | 11200 | |
UK904 | United Kingdom | Elgin PUQ platform | 22/30c | 57.011753 | 1.838911 | 100 | Total | 2001 | Operational | Condensate | Fixed steel | Above water production | 9000 | 26500 | |
UK705 | United Kingdom | Everest north | 22/9 | 57.246667 | 1.771111 | 88 | BG | 1993 | Operational | Condensate | Fixed steel | Above water production | 4500 | 12000 | |
UK707 | United Kingdom | Forties FA | 21/10 | 57.731947 | 0.972719 | 106 | Apache | 1975 | Operational | Oil | Fixed steel | Above water production | 12310 | 10551 | |
UK708 | United Kingdom | Forties FB | 21/10 | 57.749303 | 0.915058 | 106 | Apache | 1975 | Operational | Oil | Fixed steel | Above water production | 14152 | 10551 | |
UK709 | United Kingdom | Forties FC | 21/10 | 57.726953 | 0.847428 | 106 | Apache | 1975 | Operational | Oil | Fixed steel | Above water production | 14152 | 10551 | |
UK710 | United Kingdom | Forties FD | 21/10 | 57.722403 | 0.903117 | 106 | Apache | 1975 | Operational | Oil | Fixed steel | Above water production | 14152 | 10551 | |
UK711 | United Kingdom | Forties FE | 22/6 | 57.716114 | 1.032222 | 106 | Apache | 1975 | Operational | Oil | Fixed steel | Above water production | 8000 | 13700 | |
UK714 | United Kingdom | Fulmar A | 30/16 | 56.493639 | 2.154631 | 83 | Repsol-Sinopec | 1982 | Operational | Oil | Fixed steel | Above water production | 12400 | 24000 | |
UK716 | United Kingdom | Gannet A | 21/25 | 57.184376 | 0.998425 | 94 | Shell | 1993 | Operational | Oil | Fixed steel | Above water production | 7750 | 12350 | |
UK1157 | United Kingdom | Golden Eagle PUQ Platform | 20/1 | 58.070525 | 1.060331 | 105 | Nexen | 2014 | Operational | Oil | Fixed steel | Above water production | 6200 | 11500 | |
UK717 | United Kingdom | Harding Platform | 9/23 | 59.279444 | 1.516111 | 111 | Taqa Bratani | 1996 | Operational | Oil | Fixed steel | Above water production | 88000 | 23000 | |
UK718 | United Kingdom | Heather A platform | 2/5 | 60.953611 | 0.940000 | 144 | Enquest Heather | 1978 | Operational | Oil | Fixed steel | Above water production | 18700 | 12200 | |
UK720 | United Kingdom | Judy Riser Platform | 30/7 | 56.824056 | 2.385278 | 71 | ConocoPhillips | 1995 | Operational | Condensate | Fixed steel | Above water production | 7500 | 9800 | |
UK721 | United Kingdom | Kittiwake A | 21/18a | 57.468333 | 0.512142 | 87 | Enquest | 1990 | Operational | Oil | Fixed steel | Above water production | 5370 | 9000 | |
UK722 | United Kingdom | Lomond | 23/21 | 57.287542 | 2.170697 | 86 | BG | 1993 | Operational | Condensate | Fixed steel | Above water production | 5200 | 8200 | |
UK723 | United Kingdom | Magnus | 211/12 | 61.620114 | 1.307200 | 190 | BP | 1983 | Operational | Oil | Fixed steel | Above water production | 35057 | 34600 | |
UK1176 | United Kingdom | Mariner PDQ Platform | 9/11a | 59.589103 | 1.057042 | 110 | Statoil | 2018 | Operational | Oil | Fixed steel | Above water production | 31000 | 19000 | UC |
UK724 | United Kingdom | Marnock ETAP PDR Platform | 22/24a | 57.295103 | 1.663031 | 93 | BP | 1998 | Operational | Condensate | Fixed steel | Above water production | 7000 | 14000 | |
UK728 | United Kingdom | Montrose A | 22/17 | 57.450681 | 1.388250 | 91 | Repsol-Sinopec | 1976 | Operational | Oil | Fixed steel | Above water production | 6500 | 10812 | |
UK1264 | United Kingdom | Montrose BLP | 22/17n | 57.480897 | 1.432083 | 90 | Repsol-Sinopec | 1976 | Operational | Oil | Fixed steel | Above water production | 7548 | 8163 | |
UK731 | United Kingdom | Morecambe CPP1 | 110/3 | 53.846708 | -3.580739 | 32 | HRL | 1985 | Operational | Gas | Fixed steel | Above water production | 11754 | 12933 | |
UK736 | United Kingdom | Nelson | 22/11 | 57.662876 | 1.145564 | 85 | Enterprise | 1994 | Operational | Oil | Fixed steel | Above water production | 8500 | 9900 | |
UK760 | United Kingdom | Ninian Central | 3/03 | 60.856784 | 1.469093 | 135 | CNR | 1978 | Operational | Oil | Gravity-based concrete | Above water production | 384000 | 39000 | |
UK737 | United Kingdom | Ninian north | 3/3 | 60.960639 | 1.462389 | 135 | CNR | 1978 | Operational | Oil | Fixed steel | Above water production | 14100 | 17400 | |
UK738 | United Kingdom | Ninian south | 3/08 | 60.805562 | 1.450377 | 135 | CNR | 1978 | Operational | Oil | Fixed steel | Above water production | 43700 | 25500 | |
UK739 | United Kingdom | Piper B | 15/17 | 58.461361 | 0.251056 | 146 | Repsol-Sinopec | 1976 | Operational | Oil | Fixed steel | Above water production | 22555 | 28000 | |
UK740 | United Kingdom | Rough BD | 47/3d | 53.833636 | 0.441917 | 37 | Centrica | 1985 | Operational | Gas | Fixed steel | Above water production | 2651 | 9090 | |
UK632 | United Kingdom | Rough BP | 47/3d | 53.834556 | 0.443000 | 37 | Centrica | 1985 | Operational | Gas | Fixed steel | Above water production | 2397 | 8254 | |
UK741 | United Kingdom | Saltire A | 15/17 | 58.416806 | 0.334194 | 143 | Repsol-Sinopec | 1993 | Operational | Oil | Fixed steel | Above water production | 15000 | 14744 | |
UK742 | United Kingdom | Scott JD | 15/22 | 58.292222 | 0.200833 | 142 | Nexen | 1993 | Operational | Oil | Fixed steel | Above water production | 16130 | 20839 | |
UK743 | United Kingdom | Scott JU | 15/22 | 58.288333 | 0.198889 | 142 | Nexen | 1993 | Operational | Oil | Fixed steel | Above water production | 8800 | 15477 | |
UK852 | United Kingdom | Shearwater C PUQ Platform | 22/30b | 57.153911 | 1.984250 | 92 | Shell | 2000 | Operational | Condensate | Fixed steel | Above water production | 5040 | 12466 | |
UK744 | United Kingdom | Tartan A | 15/16 | 58.369847 | 0.073606 | 142 | Repsol-Sinopec | 1981 | Operational | Oil | Fixed steel | Above water production | 14090 | 14400 | |
UK745 | United Kingdom | Tern | 210/25 | 61.360111 | 0.944972 | 167 | TAQA | 1989 | Operational | Oil | Fixed steel | Above water production | 20500 | 19300 | |
UK746 | United Kingdom | Thistle A | 211/18a | 61.363036 | 1.579761 | 160 | Enquest Heather | 1978 | Operational | Oil | Fixed steel | Above water production | 31500 | 25200 | |
UK747 | United Kingdom | Tiffany | 16/17 | 58.505329 | 1.265230 | 125 | CNR | 1993 | Operational | Oil | Fixed steel | Above water production | 17500 | 20000 |