Search Results

Filter by

Content type

Select which publication types you would like to see

Topic

Select which topics you would like to see

Updated

Filter by date

For example, 21/01/2022

For example, 21/01/2022

Showing 6,871 to 6,880 of 8,391 results for sea lice


  1. Methodology

    The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future

    Part of:
    Draft Sectoral Marine Plans for Offshore Renewable Energy in Scottish Waters: Socio - Economic Assesment
  2. Appendix 3 Validating existing surface water flood hazard and risk data

    Guidance to assist the responsible authorities in preparation of Surface Water Management Plans (SWMPs) to help with the management of surface water flooding.

    Part of:
    Surface water management planning: guidance (2018)
  3. River basin management plans: consultation analysis

    Analysis of responses to consultation on proposed amendments to the Water Environment (Controlled Activities) (Scotland) Regulations 2011.

  4. References

    Report of a three year project carried out by Marine Scotland to investigate the spring component of the River South Esk salmon stock.

    Part of:
    Spring salmon on the River South Esk, Scotland: Scottish Marine and Freshwater Science Vol 7 No 10
  5. How to respond

    This supplementary consultation on Strategic Environmental Assessment (SEA) and site classification seeks views on an updated Environmental Report (ER).

    Part of:
    Proposed special protection areas for Scottish marine birds: supplementary consultation
  6. A.15. Tourism

    Sets out the methodology and scenarios for scoping and undertaking a socio-economic impact assessment.

    Part of:
    Sectoral marine plan for offshore wind energy: social and economic impact assessment scoping report
  7. 1. Introduction

    Remote electronic monitoring (REM) is a component of our Future Fisheries Management Strategy (FFM). This policy explores the installation of cameras, GPS and sensors on board vessels to monitor fishing activity.

    Part of:
    Marine resources - ensuring long term sustainability: remote electronic monitoring (REM) consultation
  8. Annex C: Suggestions with Potential but Not Contributing to the Proposed National Developments

    Report of assessment for the draft national developments as part of Scotland 2045 Our Fourth National Planning Framework.

    Part of:
    Scotland 2045 - fourth National Planning Framework - draft - national developments: assessment report
  9. Permitted development rights - phase 1 priority development types: consultation

    Consultation on draft proposals for changes and extensions to Permitted Development Rights (PDR) in Scotland for the priority development types selected for inclusion in Phase 1 of our programme. Consultation closes on 12 November 2020.

  10. SECTION 4 KEY STAGES IN THE PLANNING PROCESS AND OPPORTUNITIES FOR STAKEHOLDER PARTICIPATION

    The Plan Scheme sets out step by step how the pilot plan will be prepared and outlines the opportunities for stakeholders to get involved. The Plan Scheme is updated and publicised at key stages in the process to inform stakeholders and the general

    Part of:
    Pilot Pentland Firth and Orkney Waters Marine Spatial Plan. The Plan Scheme 2012.
Back to top