Search Results
Showing 6,871 to 6,880 of 8,391 results for sea lice
-
Methodology
The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future
-
Appendix 3 Validating existing surface water flood hazard and risk data
Guidance to assist the responsible authorities in preparation of Surface Water Management Plans (SWMPs) to help with the management of surface water flooding.
-
River basin management plans: consultation analysis
Analysis of responses to consultation on proposed amendments to the Water Environment (Controlled Activities) (Scotland) Regulations 2011.
-
References
Report of a three year project carried out by Marine Scotland to investigate the spring component of the River South Esk salmon stock.
-
How to respond
This supplementary consultation on Strategic Environmental Assessment (SEA) and site classification seeks views on an updated Environmental Report (ER).
-
A.15. Tourism
Sets out the methodology and scenarios for scoping and undertaking a socio-economic impact assessment.
-
1. Introduction
Remote electronic monitoring (REM) is a component of our Future Fisheries Management Strategy (FFM). This policy explores the installation of cameras, GPS and sensors on board vessels to monitor fishing activity.
-
Annex C: Suggestions with Potential but Not Contributing to the Proposed National Developments
Report of assessment for the draft national developments as part of Scotland 2045 Our Fourth National Planning Framework.
-
Permitted development rights - phase 1 priority development types: consultation
Consultation on draft proposals for changes and extensions to Permitted Development Rights (PDR) in Scotland for the priority development types selected for inclusion in Phase 1 of our programme. Consultation closes on 12 November 2020.
-
SECTION 4 KEY STAGES IN THE PLANNING PROCESS AND OPPORTUNITIES FOR STAKEHOLDER PARTICIPATION
The Plan Scheme sets out step by step how the pilot plan will be prepared and outlines the opportunities for stakeholders to get involved. The Plan Scheme is updated and publicised at key stages in the process to inform stakeholders and the general
There is a problem
Thanks for your feedback