Search Results
Showing 7,871 to 7,880 of 8,391 results for sea lice
-
Scotland's Marine Protected Area (MPA) network
An overview of the consultation on proposals to designate four new Marine Protected Areas in Scottish waters, including short summaries of the available documentation.
-
6 References
This report describes a trial of self-sampling by fishermen as a means of collecting information on discards. The project was funded by the Scottish Government under the Fishing Industry Science Alliance (FISA) and carried out in partnership with
-
Annex 6: Survey instruments
Research aimed to provide socio-economic understanding of the value of Scottish bathing waters and the influence of bathing water quality (BWQ) to bathers, beach users and to the national and local economies.
-
How We Are Developing the Programme
We want to hear your views on Scotland's new five-year climate change adaptation programme to be launched in autumn 2019.
-
3 Tidal Draft Plan Option
Appendix D to the SEA Environmental Report of the Draft Sectoral Marine Plans for Offshore Renewable Energy in Scottish Waters. This appendix contains a Draft Plan Options Assessment.
-
Single-use disposable cups: EPECOM recommendations
The first report from Expert Panel on Environmental Charging and Other Measures (EPECOM) sets out its recommendations to tackle the dependence on, and environmental impact of, single-use disposable beverage cups in Scotland.
-
Outcome 3: Our inclusive and sustainable economy is flexible, adaptable and responsive to the changing climate
We want to hear your views on Scotland's new five-year climate change adaptation programme to be launched in autumn 2019.
-
Appendix I. Avian influenza (AI)
Information on how and when operational partners should respond to a suspect or confirmed exotic notifiable animal disease outbreak.
-
2 Process: Workshops
This report provides the background, the process and the outcomes of an interdisciplinary project entitled “The Cooperative Participatory Evaluation of Renewable Technologies on Ecosystem Services: CORPORATES”, funded by the UK Natural
-
Annex B: Business and Regulatory Impact Assessment Template
Consultation on draft proposals for changes and extensions to Permitted Development Rights (PDR) in Scotland for the priority development types selected for inclusion in Phase 1 of our programme. Consultation closes on 12 November 2020.
There is a problem
Thanks for your feedback