Search Results
Showing 6,551 to 6,560 of 8,388 results for sea lice
-
Strategic Environmental Assessment (SEA) of the Scottish Climate Change Bill: Consultation Proposals: Non Technical Summary
Non Technical Summary - Strategic Environmental Assessment (SEA) of the Scottish Climate Change Bill: Consultation Proposals: Final Environmental Report (Post-Consultation Issue) November 2008
-
Fetlar to Haroldswick (FTH)
This is Appendix E for the pMPA Impact and Sustainability Report containing the detailed site by site reports. Published separately due to size.
-
13 Population and human health
Environmental report for the strategic environmental assessment (SEA) of our preferred policy position on unconventional oil and gas in Scotland.
-
A.12. Recreational Boating
Sets out the methodology and scenarios for scoping and undertaking a socio-economic impact assessment.
-
1. Introduction
These guidance principles provide a first step in developing an appropriate approach for defining the impact area on land for large industrial developments (such as offshore windfarms) at sea. The principles are based on a review of literature and
-
17. Appendix D: Protected Sites Supporting Sensitive Features
Investigates the sustainability and potential environmental impacts of wild seaweed and seagrass harvesting, maerl extraction and removal of beach-cast seaweed.
-
1 Introduction
Strategic Environmental Assessment Post-Adoption Statement.
-
Footnotes
The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future
-
Lochs Duich, Long and Alsh (DLA)
This is Appendix E for the pMPA Impact and Sustainability Report containing the detailed site by site reports. Published separately due to size.
-
C.13. Recreational Boating
This report provides Marine Scotland with evidence on economic and social effects to inform a Business and Regulatory Impact Assessment (BRIA) for each possible NC MPA, and a Sustainability Appraisal for the suite of proposals as a whole.
There is a problem
Thanks for your feedback