Search Results
Showing 7,481 to 7,490 of 8,157 results for sea lice
-
Footnotes
Provides advice on how the requirements of the Environmental Assessment (Scotland) Act 2005 can be met within the development planning process.
-
15.0 NEXT STEPS
This Environmental Report sets out the results of the assessment of the possible environmental effects of provisions in the Aquaculture and Fisheries Bill.
-
B6. Energy Generation
The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future
-
6 Best practice for multi-survey analyses of seabird distributions
This study developed best practice guidance to combine seabird survey data collected from different platforms based on a literature review, expert knowledge and a bespoke model development including sensitivity analysis. This can be used in
-
Oil and Gas Industry Crossover
Report of study which examined the technical, logistical, contractual and economic feasibility of installing a deep geothermal single well system at the new site of the Aberdeen Exhibition and Conference Centre.
-
Protected Area D - Loch Sunart to Sound of Jura MPA
2014 Consultation on the Management of Inshore Special Areas of Conservation and Marine Protected Areas Overview document.
-
9 References
This project developed a new framework to enable the assessment of collision, displacement and barrier effects on seabirds from offshore renewable developments to be integrated into a single overall assessment of combined impacts.
-
4 Background: Collision risk modelling
This project developed a new framework to enable the assessment of collision, displacement and barrier effects on seabirds from offshore renewable developments to be integrated into a single overall assessment of combined impacts.
-
6. Peatland Restoration
Consultation on draft proposals for changes and extensions to Permitted Development Rights (PDR) in Scotland for the priority development types selected for inclusion in Phase 1 of our programme. Consultation closes on 12 November 2020.
-
Sector: Energy
This pipeline update provides information relating to the delivery of key major infrastructure programmes included at Annex D of our Infrastructure Investment Plan published in February 2021 and other ongoing key major infrastructure programmes
There is a problem
Thanks for your feedback