Search Results
Showing 1,891 to 1,900 of 2,609 results for pollution
-
PART 6: The Practicability, Effectiveness and Durability of Remediation
This document promulgates revised statutory guidance for the operation of the contaminated land regime following implementation of the Contaminated Land (Scotland) Regulations 2005. It replaces the earlier 2000 version.
-
Footnotes
Sets out the proposed scope and level of detail for the assessment, as well as a description of the methodology.
-
16.0 Annex B: Demand elasticities of food products
Final Business and Regulatory Impact Assessment (BRIA) for the introduction of market restrictions on problematic single-use plastic items as identified in Article 5 of the EU Single-Use Plastics Directive (EU SUPD).
-
3.9 Private wastewater treatment systems – infiltration systems
The Building Standards technical handbooks provide guidance on achieving the standards set in the Building (Scotland) Regulations 2004 and are available in two volumes, domestic buildings and non-domestic buildings. This publication is available in
-
A1 Stakeholder engagement findings
Research looking into the network constraints issues associated with the electrification of heat for domestic new build developments. The focus of the work was on connection costs for these developments, how the cost is defined, and apportioned to
-
Summary
This report explores the potential need for acoustic deterrent devices at high energy sites to warn marine mammals to the presence of tidal devices.
-
3.0 Environmental Baseline
Environmental report setting out the findings of the strategic environmental assessment (SEA) undertaken to inform preparation of Scotland's draft National Planning Framework 4 (NPF4).
-
15. Appendix B: Environmental Protection Objectives
Investigates the sustainability and potential environmental impacts of wild seaweed and seagrass harvesting, maerl extraction and removal of beach-cast seaweed.
-
3.9 Private wastewater treatment systems – infiltration systems
The building standards technical handbooks provide guidance on achieving the standards set in the Building (Scotland) Regulations 2004. This handbook applies to a building warrant submitted on or after 1 October 2019 and to building work which does
-
Stage 4: Decision making and monitoring (Identifying and establishing any required mitigation action)
We published a partial equality impact assessment during the public consultation on the introduction of market restrictions on problematic single-use items in Scotland, which took place between 12/10/202 and 04/01/2021. This EQIA expands that work
There is a problem
Thanks for your feedback