Search Results

Filter by

Content type

Select which publication types you would like to see

Topic

Select which topics you would like to see

Updated

Filter by date

For example, 21/01/2022

For example, 21/01/2022

Showing 7,481 to 7,490 of 8,157 results for sea lice


  1. Oil and Gas Industry Crossover

    Report of study which examined the technical, logistical, contractual and economic feasibility of installing a deep geothermal single well system at the new site of the Aberdeen Exhibition and Conference Centre.

    Part of:
    Feasibility Report of a Deep Geothermal Single Well, Aberdeen Exhibition and Conference Centre
  2. Protected Area D - Loch Sunart to Sound of Jura MPA

    2014 Consultation on the Management of Inshore Special Areas of Conservation and Marine Protected Areas Overview document.

    Part of:
    2014 Consultation on the Management of Inshore Special Areas of Conservation and Marine Protected Areas Overview
  3. Question 13b. Is promoting and supporting economic growth important?

    This report outlines the Working Group response to comments received in relation to the Pentland Firth and Orkney Waters Planning Issues and Options Consultation Paper.

    Part of:
    Pilot Pentland Firth and Orkney Waters Marine Spatial Plan. Consultation Report
  4. Footnotes

    Provides advice on how the requirements of the Environmental Assessment (Scotland) Act 2005 can be met within the development planning process.

    Part of:
    Planning Advice Note 1/2010: strategic environmental assessment of development plans
  5. B6. Energy Generation

    The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future

    Part of:
    Draft Sectoral Marine Plans for Offshore Renewable Energy in Scottish Waters: Socio - Economic Assesment
  6. 6 Best practice for multi-survey analyses of seabird distributions

    This study developed best practice guidance to combine seabird survey data collected from different platforms based on a literature review, expert knowledge and a bespoke model development including sensitivity analysis. This can be used in

    Part of:
    Develop best practice recommendations for combining seabird study data collected from different platforms: study
  7. 6. Peatland Restoration

    Consultation on draft proposals for changes and extensions to Permitted Development Rights (PDR) in Scotland for the priority development types selected for inclusion in Phase 1 of our programme. Consultation closes on 12 November 2020.

    Part of:
    Permitted development rights - phase 1 priority development types: consultation
  8. Footnotes

    Partial impact assessments relating to the consultation on council tax for second and long term empty homes, and thresholds for non-domestic rates.

    Part of:
    Non-domestic rates/Council Tax second and empty homes consultation: partial impact assessments
  9. New Climate Change Adaptation Programme In 2019

    Fifth annual progress report on the Climate Ready Scotland: Scottish climate change adaptation programme (SCCAP) 2014.

    Part of:
    Scottish climate change adaptation programme: progress report 2019
  10. Appendix A: Data used in modelling

    This study investigated the potential impacts of climate change on seabird distribution, abundance and demography off the east coast of Scotland, and examined integration of these climate models into standard population forecast models used in

    Part of:
    Impact of climate change on seabird species off the east coast of Scotland and potential implications for environmental assessments: study
Back to top