Search Results

Filter by

Content type

Select which publication types you would like to see

Topic

Select which topics you would like to see

Updated

Filter by date

For example, 21/01/2022

For example, 21/01/2022

Showing 6,541 to 6,550 of 8,157 results for sea lice


  1. Footnotes

    Consultation on draft proposals for changes and extensions to Permitted Development Rights (PDR) in Scotland for the priority development types selected for inclusion in Phase 1 of our programme. Consultation closes on 12 November 2020.

    Part of:
    Permitted development rights - phase 1 priority development types: consultation
  2. 01 Making plans for the future

    We are seeking views on proposals to strengthen the planning system.

    Part of:
    Places, people and planning: consultation on the future of the Scottish planning system
  3. Introduction

    This paper assesses the potential implementation of the de minimis exemption in Scotland.

    Part of:
    An assesment of the De Minimis Exemption in the CFP discarding regulation: for Scottish Fleets
  4. 5 Environmental Baseline

    This Environmental Report documents the results of the Strategic Environmental Assessment (SEA) which is an assessment of the effects of the plans on relevant environmental receptors. In this assessment the effects of the plan on the following have

    Part of:
    Draft Sectoral Marine Plans for Offshore Renewable Energy in Scottish Waters- Strategic Environmental Assessment: Environmental Report and Appendix A
  5. Appendix II. Tables

    By 2020 the percentage of Scotland‟s energy coming from renewable sources will increase. Studies have identified that there is a need to research how offshore renewable developments affect wildlife populations. The surveys presented here will help

    Part of:
    Scottish Marine and Freshwater Science Volume 5 Number 9: Strategic Surveys of Seabirds off the West Coast of Lewis to Determine Use of Seaspace in Areas of Potential Marine Renewable Energy Developments
  6. 2. Introduction

    Annual report of the wildlife observation programme underway at the European Marine Energy Centre (EMEC) in Orkney.

    Part of:
    Scottish Marine and Freshwater Science Volume 5 Number 8: EMEC Billia Croo Wave Test Site: Wildlife Observations Project Annual Report
  7. 5. PROPORTIONALITY

    Provides advice on how the requirements of the Environmental Assessment (Scotland) Act 2005 can be met within the development planning process.

    Part of:
    Planning Advice Note 1/2010: strategic environmental assessment of development plans
  8. 4. General Discussion

    This report presents the results of Scottish regional scallop stock assessments carried out by Marine Scotland Science (MSS) based on commercial catch-at-age and survey data up to and including 2010.

    Part of:
    Scottish Marine and Freshwater Science Volume 3 Number 10: Scottish Scallop Stocks - Results of 2011 Assessments
  9. 9 Conclusions

    This study reviewed data that have been collected from offshore windfarms and considers how they can be used to derive appropriate avoidance rates for use in the offshore environment.

    Part of:
    Scottish Marine and Freshwater Science Volume 5 Number 16:The Avoidance Rates of Collision Between Birds and Offshore Turbines
  10. 6. The option to classify either 2 SPAs or 1 SPA in Orkney waters

    This supplementary consultation on Strategic Environmental Assessment (SEA) and site classification seeks views on an updated Environmental Report (ER).

    Part of:
    Proposed special protection areas for Scottish marine birds: supplementary consultation
Back to top