Search Results
Showing 7,431 to 7,440 of 8,143 results for sea lice
-
8. Categories of fees
This Circular provides guidance on the Town and Country Planning (Fees for Applications) (Scotland) Regulations 2022 and replaces Circulars 1/2004 and 2/2013
-
Annex B: Respondent List
Consultation report regarding the transposition of the European Environmental Impact Assessment (EIA) Directive into Scottish legislation.
-
PARTIAL BUSINESS AND REGULATORY IMPACT ASSESSMENT
Consultation paper proposing the introduction of registerable marine activities and introducing a requirement for pre-application consultation for applications for certain classes of marine licence.
-
ENDNOTES AND REFERENCES
Guidance to support public bodies in exercising their duties under the Climate Change (Scotland) Act 2009.
-
Summary
The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future
-
Aquaculture
All developments and activities which take place in Scotland’s seas have implications onshore too – ranging from changing infrastructure requirements to the impacts on communities of economic growth or decline. The Scottish Government has
-
Glossary
Planning Advice Note (PAN) 51, (revised in 2006) supports the existing policy on the role of the planning system in relation to the environmental protection regimes.
-
4 Approaches to multi-survey modelling
This study developed best practice guidance to combine seabird survey data collected from different platforms based on a literature review, expert knowledge and a bespoke model development including sensitivity analysis. This can be used in
-
Annex C – Local Development Plan Process
Part C of the local development planning - regulations and guidance consultation sets out: (1) the overall aims and expectations for new style LDPs; (2) the process of how to achieve a new style plans; (3) and detailed thematic guidance on how new
-
APPENDIX F: Draft HRA Record
This report summarises the findings of the Sustainability Appraisal undertaken on the draft pilot Pentland Firth and Orkney Waters Marine Spatial Plan incorporating a Strategic Environmental Assessment (SEA) required under Directive 2001/42/EC and
There is a problem
Thanks for your feedback