Search Results
Showing 7,621 to 7,630 of 8,125 results for sea lice
-
C9. Ports and Harbours
The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future
-
4. Output and Trade Overview
This research assesses the impacts of future Free Trade Agreements (FTAs) between the UK and four selected non-EU trading partners on key Scottish agricultural sectors. The work combines trade-model and farm-level analysis, supplemented by industry
-
1. Introduction
The maximising the total value added report includes recommendations designed to facilitate long term stability and predictability for the industry.
-
4. Definition of HPMAs
This report seeks to complete the first two stages of the island communities impact assessment (ICIA) process by identifying whether there are issues which merit further exploration. Consultation responses will be used to determine whether a full
-
6. References
Understanding seabird flight heights and behaviour in and around operational offshore wind farms is a priority knowledge gap. Using aircraft mounted LiDAR technology, this study collected data on seabird flight height and shows the potential for
-
2. Children's Rights and Wellbeing Impact Assessment
Partial impact assessments relating to the consultation on council tax for second and long term empty homes, and thresholds for non-domestic rates.
-
8 Findings of Assessment of Policies
This report summarises the findings of the Sustainability Appraisal undertaken on the draft pilot Pentland Firth and Orkney Waters Marine Spatial Plan incorporating a Strategic Environmental Assessment (SEA) required under Directive 2001/42/EC and
-
Section 3: Overall Discussion and Implications for Collision Modelling
The aim of this study was to investigate how often porpoises occurred in two areas of immediate interest for tidal-stream development on the west coast of Scotland. These two sites were the tidal narrows of the Sound of Islay (between the islands of
-
Annex A: Programme Highlights of the 4th Annual Progress Report
Fourth annual progress report on the Climate Ready Scotland: Scottish climate change adaptation programme.
-
3. Options
The partial business and regulatory impact assessment (BRIA) presents an initial assessment of the potential costs, benefits and risks of introducing HPMAs and their potential impacts on public, private or third sectors.
There is a problem
Thanks for your feedback