Search Results
Showing 7,551 to 7,560 of 8,126 results for sea lice
-
5 Comments on the draft Plan and how these have been taken into account
This Post Adoption Statement concludes the Strategic Environmental Assessment process and sets out those ways in which the findings of the Strategic Environmental Assessment Environmental Report, and the views expressed by consultees have been taken
-
3 Results
Review of the existing evidence on public attitudes and behaviour related to air pollution to inform the draft of the new Cleaner Air for Scotland (CAFS) strategy.
-
Appendix 7: East Mingulay SAC Management Measures
2014 Consultation on the management of inshore Special Areas of Conservation and Marine Protected Areas - Consultation analysis report. Summary of the responses received relating to each site.
-
2 Wave Draft Plan Options
Appendix D to the SEA Environmental Report of the Draft Sectoral Marine Plans for Offshore Renewable Energy in Scottish Waters. This appendix contains a Draft Plan Options Assessment.
-
Annex B: Breakdown of crime codes for the new grouping structure
Summarises the responses to the consultation on the future of recorded crime and police activity statistics. It also outlines a package of changes to the production of Scotland’s recorded crime statistics.
-
Chapter 4: Theme 1: Enabling the Transition to Net Zero Emissions and Environmental Sustainability
The Infrastructure Investment Plan outlines a coherent, and strategic approach to delivering our National Infrastructure Mission. The Plan demonstrates the vital role infrastructure has to play in helping businesses and communities to adapt and
-
0.3 Exempted buildings and services, fittings and equipment
Provides guidance on achieving the standards set in the Building (Scotland) Regulations 2004. This handbook applies to a building warrant submitted on or after 1 June 2022 and to building work which does not require a warrant commenced from that date
-
Part 3 - National Planning Policy, Distinctive Places
Independent analysis of the responses to our consultation on the draft fourth National Planning Framework (draft NPF4), which ran from 10 November 2021 to 31 March 2022.
-
2. Approach
Island Communities Impact Assessment (ICIA) of the Fair Work Action Plan 2022 and Anti-Racist Employment Strategy 2022.
-
Section 11. Crosscutting or overarching marine planning policies
This report outlines the Working Group response to comments received in relation to the Pentland Firth and Orkney Waters Planning Issues and Options Consultation Paper.
There is a problem
Thanks for your feedback