Search Results
Showing 6,601 to 6,610 of 8,126 results for sea lice
-
1. Introduction
Report establishing whether there would be substantial overlap of potential beaver habitat and known Atlantic salmon distribution, should beavers be formally reintroduced to Scotland.
-
Annex C: Overview Isle of Man Trawl Fishery Summary 2016
Seeking views on introducing new management measures in the Queen Scallop fishery in ICES divisions VIa and VIIa.
-
Recommendations
Information on smolt sizes is required to plan acoustic tagging studies aiming to improve understanding of fish movement and behaviour in the coastal zone, to aid planning for marine renewables. This report assessed pre-existing information on smolt
-
9. Monitoring and Delivery
Sets out the policies that are already in place to cut emissions and further proposals to enable Scotland to meet the annual emissions targets from 2010 to 2022.
-
Offshore wind, wave and tidal energy applications: consenting and licensing manual
This document provides guidance on applying for consents and marine licences for offshore renewable energy projects within both Scottish Territorial Waters (out to 12 nautical miles (“nm”)) and Scottish Offshore Waters (12-200 nm). It updates
-
4 Geographical Distribution of VHS
Report on an outbreak of viral haemorrhagic septicaemia in multiple stocked species of wrasse on six sea-water sites around Shetland Mainland commencing December 2012.
-
Methodology
The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future
-
Appendix 3 Validating existing surface water flood hazard and risk data
Guidance to assist the responsible authorities in preparation of Surface Water Management Plans (SWMPs) to help with the management of surface water flooding.
-
Permitted development rights - phase 1 priority development types: consultation
Consultation on draft proposals for changes and extensions to Permitted Development Rights (PDR) in Scotland for the priority development types selected for inclusion in Phase 1 of our programme. Consultation closes on 12 November 2020.
-
River basin management plans: consultation analysis
Analysis of responses to consultation on proposed amendments to the Water Environment (Controlled Activities) (Scotland) Regulations 2011.
There is a problem
Thanks for your feedback