Search Results
Showing 7,621 to 7,630 of 8,124 results for sea lice
-
C9. Ports and Harbours
The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future
-
1. Introduction
The maximising the total value added report includes recommendations designed to facilitate long term stability and predictability for the industry.
-
Annex A: Programme Highlights of the 4th Annual Progress Report
Fourth annual progress report on the Climate Ready Scotland: Scottish climate change adaptation programme.
-
3. Options
The partial business and regulatory impact assessment (BRIA) presents an initial assessment of the potential costs, benefits and risks of introducing HPMAs and their potential impacts on public, private or third sectors.
-
4. Definition of HPMAs
This report seeks to complete the first two stages of the island communities impact assessment (ICIA) process by identifying whether there are issues which merit further exploration. Consultation responses will be used to determine whether a full
-
6.9 Energy performance certificates
The building standards technical handbooks provide guidance on achieving the standards set in the Building (Scotland) Regulations 2004. This handbook applies to a building warrant submitted on or after 1 March 2021 and to building work which does
-
Permitted Development Rights (PDR) - review and extension: consultation analysis
Analysis of responses to a public consultation on phase 1 of the Scottish Government’s programme to review and extend Permitted Development Rights (PDR).
-
6. References
Understanding seabird flight heights and behaviour in and around operational offshore wind farms is a priority knowledge gap. Using aircraft mounted LiDAR technology, this study collected data on seabird flight height and shows the potential for
-
2. Children's Rights and Wellbeing Impact Assessment
Partial impact assessments relating to the consultation on council tax for second and long term empty homes, and thresholds for non-domestic rates.
-
8 Findings of Assessment of Policies
This report summarises the findings of the Sustainability Appraisal undertaken on the draft pilot Pentland Firth and Orkney Waters Marine Spatial Plan incorporating a Strategic Environmental Assessment (SEA) required under Directive 2001/42/EC and
There is a problem
Thanks for your feedback