Search Results
Showing 7,801 to 7,810 of 8,123 results for sea lice
-
7. Next steps
Strategic environmental assessment draft post adoption statement setting out how the assessment and consultation responses have been taken into account within the development of the Proposed programme for reviewing and extending permitted
-
Deep Geothermal Heat in Scotland
Report of study which examined the technical, logistical, contractual and economic feasibility of installing a deep geothermal single well system at the new site of the Aberdeen Exhibition and Conference Centre.
-
Annex D Sites of Special Scientific Interest (SSSIs)
This reports on which sites are currently included in the MPA network and outlines progress on Nature Conservation MPAs, Historic MPAs, and Demonstration and Research MPAs.
-
Section 38(5) of the Act
This consultation document is about section 38 of the Act, which relates to the duty to notify and provide information about victims.
-
0.3 Exempted buildings and services, fittings and equipment
The building standards technical handbooks provide guidance on achieving the standards set in the Building (Scotland) Regulations 2004. This handbook applies to a building warrant submitted on or after 1 March 2021 and to building work which does
-
28. Sectoral Policy 3: Oil and gas
The Pentland Firth and Orkney Waters Marine Spatial Plan is a pilot process undertaken by a working group consisting of Marine Scotland, Orkney Islands Council and Highland Council in advance of statutory regional marine planning. This report
-
20. General Policy 6: Historic environment
The Pentland Firth and Orkney Waters Marine Spatial Plan is a pilot process undertaken by a working group consisting of Marine Scotland, Orkney Islands Council and Highland Council in advance of statutory regional marine planning. This report
-
11.0 ESCAPES
This Environmental Report sets out the results of the assessment of the possible environmental effects of provisions in the Aquaculture and Fisheries Bill.
-
10. Wider impacts
Overview of our Climate Change Plan 2018-2032, setting out how we will continue to drive down emissions over the period to 2032.
-
2. Assessment findings
This report considers the potential impacts of introducing the draft National Planning Framework 4 (NPF4) including on protected characteristics.
There is a problem
Thanks for your feedback