Search Results
Showing 16,221 to 16,230 of 17,295 results for ministerial travel
-
Other Factors Impacting On Equality
An equality impact assessment (EQIA) for the autumn/winter 2021-2022 Flu and COVID-19 vaccination programme.
-
Footnotes
Equality impact assessment (EQIA) for prolonged home working for Scottish Government staff and new safe and secure workplace arrangements in response to COVID-19.
-
Children and Young People’s Mental Health and Wellbeing Joint Delivery Board information bulletin: June 2022
Information bulletin for June 2022.
-
Options Developed and supporting research
We are seeking views on a proposed target relating to the combined supply of thermal energy through heat networks in Scotland in 2035.
-
2. Background
Provides information on the minimum re-sampling densities required to evalaute carbon stocks on Scottish peatlands and includes an evaluation of the accuracy of the ECOSSE model to simulate measured changes in soil carbon.
-
6. Modelling the Impacts of Construction and Operation of Wind Farms on Peat
This approach was developed to calculate the impact of wind farm developments on the soil carbon stocks held in peats. It provides a transparent and easy to follow method for estimating the impacts of wind farms on the carbon dynamics of peat lands.
-
Annex 3: Framework to Support the storage, removal and enforced prohibition of materials left in common areas of high rise domestic buildings that constitute a fire risk
This guidance provides practical fire safety advice on how to prevent fires and reduce the risks from fires in high rise domestic buildings.
-
Chapter 3: Risk Management – Assessing the Risk to Persons
This guidance provides practical fire safety advice on how to prevent fires and reduce the risks from fires in high rise domestic buildings.
-
2.14 Fire and rescue service facilities
The building standards technical handbooks provide guidance on achieving the standards set in the Building (Scotland) Regulations 2004. This handbook applies to a building warrant submitted on or after 1 March 2021 and to building work which does
-
5. Business and the Public Sector
Sets out the policies that are already in place to cut emissions and further proposals to enable Scotland to meet the annual emissions targets from 2010 to 2022.
There is a problem
Thanks for your feedback