Search Results
Showing 6,901 to 6,910 of 8,117 results for sea lice
-
Marine Legislation
All developments and activities which take place in Scotland’s seas have implications onshore too – ranging from changing infrastructure requirements to the impacts on communities of economic growth or decline. The Scottish Government has
-
6. Assessment for Offshore Wind, Wave and Tidal Draft Plan Option Areas - North West
The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future
-
B9. Ports and Harbours
The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future
-
3 Creation of a permanent MPA (Q1–3)
Analysis of responses to our consultation on the proposal to designate Red Rocks and Longay as a Marine Protected Area which ran from 1 February 2022 to 26 April 2022.
-
Annex B: Suggestions Contributing to the Proposed National Developments (in whole or in part)
Report of assessment for the draft national developments as part of Scotland 2045 Our Fourth National Planning Framework.
-
PART THREE
Report of the first year of work of the Remote and Rural General Practice Working Group.
-
6. Benefits
This report provides Marine Scotland with evidence on economic and social effects to inform a Business and Regulatory Impact Assessment (BRIA) for each possible NC MPA, and a Sustainability Appraisal for the suite of proposals as a whole.
-
6 Good Practice Guidance for the assessment of fisheries displacement
This project developed ‘Good Practice Guidance for Assessing Fisheries Displacement’ through a detailed literature review and consultation with the ScotMER Fish and Fisheries Receptor Group (FFSRG), commercial fisheries industry, offshore energy
-
Question 14
Analysis of the responses received to the full public consultation, between 4 December 2020 to 26 February 2021, of the Farm Animal Welfare Committee's opinion on the welfare of animals during transport.
-
Appendix B Footnote
This report summarises the findings of the Sustainability Appraisal undertaken on the draft pilot Pentland Firth and Orkney Waters Marine Spatial Plan incorporating a Strategic Environmental Assessment (SEA) required under Directive 2001/42/EC and
There is a problem
Thanks for your feedback