Search Results
Showing 7,611 to 7,620 of 8,117 results for sea lice
-
4. Output and Trade Overview
This research assesses the impacts of future Free Trade Agreements (FTAs) between the UK and four selected non-EU trading partners on key Scottish agricultural sectors. The work combines trade-model and farm-level analysis, supplemented by industry
-
Page 16
Sample tenancy document for the use of landlords and tenants.
-
C9. Ports and Harbours
The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future
-
Appendix C. List of Stakeholders
The Data Gap Analysis Report summarises the background to and aims of the overall appraoch to socio-economics and offshore renewable energy planning. It sets out the approach that has been adopted to identifying baseline information requirements,
-
1. Introduction
The maximising the total value added report includes recommendations designed to facilitate long term stability and predictability for the industry.
-
Section 3: Overall Discussion and Implications for Collision Modelling
The aim of this study was to investigate how often porpoises occurred in two areas of immediate interest for tidal-stream development on the west coast of Scotland. These two sites were the tidal narrows of the Sound of Islay (between the islands of
-
Annex A: Programme Highlights of the 4th Annual Progress Report
Fourth annual progress report on the Climate Ready Scotland: Scottish climate change adaptation programme.
-
3. Options
The partial business and regulatory impact assessment (BRIA) presents an initial assessment of the potential costs, benefits and risks of introducing HPMAs and their potential impacts on public, private or third sectors.
-
4. Definition of HPMAs
This report seeks to complete the first two stages of the island communities impact assessment (ICIA) process by identifying whether there are issues which merit further exploration. Consultation responses will be used to determine whether a full
-
6.9 Energy performance certificates
The building standards technical handbooks provide guidance on achieving the standards set in the Building (Scotland) Regulations 2004. This handbook applies to a building warrant submitted on or after 1 March 2021 and to building work which does
There is a problem
Thanks for your feedback