Search Results
Showing 7,401 to 7,410 of 8,117 results for sea lice
-
3 Approach to the Assessment
This initial socio-economic impact assessment (SEIA) identifies and assesses potential economic and social effects of HPMAs and proposes a methodology for carrying out the site specific SEIAs.
-
Useful Information
This study analysed the stomach contents of goosanders and cormorants collected from the Rivers Tweed, Dee, Nith and Spey during 2019 and 2020 in order to to assess whether there was evidence of substantial changes in the diets of these species of
-
8. Categories of fees
This Circular provides guidance on the Town and Country Planning (Fees for Applications) (Scotland) Regulations 2022 and replaces Circulars 1/2004 and 2/2013
-
Annex A
Scotland's offshore wind route map: Developing Scotland's offshore wind industry to 2020.
-
Footnotes
This is our second report on proposals and policies (RPP2) for meeting our climate change targets.
-
4 Approaches to multi-survey modelling
This study developed best practice guidance to combine seabird survey data collected from different platforms based on a literature review, expert knowledge and a bespoke model development including sensitivity analysis. This can be used in
-
Annex C – Local Development Plan Process
Part C of the local development planning - regulations and guidance consultation sets out: (1) the overall aims and expectations for new style LDPs; (2) the process of how to achieve a new style plans; (3) and detailed thematic guidance on how new
-
APPENDIX F: Draft HRA Record
This report summarises the findings of the Sustainability Appraisal undertaken on the draft pilot Pentland Firth and Orkney Waters Marine Spatial Plan incorporating a Strategic Environmental Assessment (SEA) required under Directive 2001/42/EC and
-
Annex B: Respondent List
Consultation report regarding the transposition of the European Environmental Impact Assessment (EIA) Directive into Scottish legislation.
-
Annex A: Table 2 - SRDP 2014 - 2020 Policy Development: Key Milestones
Stage 2 document setting out the final proposals for the new rural development programme period (2014-2020).
There is a problem
Thanks for your feedback