Search Results
Showing 25,331 to 25,340 of 26,413 results for ministerial engagements
-
McClelland Report: Key Messages
Our response to the McClelland review of public sector information and communication technology infrastructure.
-
Introduction
Update on the progress that has been made since the publication of the national action plan to prevent and eradicate Female Genital Mutilation (FGM) in February 2016.
-
4. Supporting attendance and managing absence
Guidance to education authorities in Scotland on the promotion of good attendance and the management of attendance.
-
Annex B - Data Tables
An analysis of responses received to the discussion document on safe and effective staffing in health and social care.
-
Evaluation of the Children, Young People and Families Early Intervention and Adult Learning and Empowering Communities Fund: research findings
Iconic Consulting is conducting a formative evaluation of the core funding awards made by the CYPFEI & ALEC Fund.
-
3. Proposed Objectives of the Fund
Analysis of the findings of the consultation into the Replacement for the European Structural and Investment Funds (ESIF) Post-EU Exit in Scotland carried out between 5 November 2019 - 12 February 2020.
-
7. Allocation and Funding Duration
Analysis of the findings of the consultation into the Replacement for the European Structural and Investment Funds (ESIF) Post-EU Exit in Scotland carried out between 5 November 2019 - 12 February 2020.
-
Appendix C: Depth interview topic guides
Independent evaluation of the practical fire safety guidance for existing high rise domestic buildings and the practical fire safety guidance for existing specialised housing to determine whether the guidance is used by those it is intended for, is
-
Screening
Summary of results for the Equality Impact Assessment (EQIA) undertaken to consider the impacts on equality of Scotland’s National Strategy for Economic Transformation Programme 1: Entrepreneurial People and Culture
-
Progress to November 2022
Overview of the health and social care commitment, including milestones and their co-creation process, alongside progress reports submitted throughout the action plan.
There is a problem
Thanks for your feedback