Search Results
Showing 25,631 to 25,640 of 26,410 results for Ministerial engagements or ministerialengagements
-
Lochs Duich, Long and Alsh (DLA)
This is Appendix E for the pMPA Impact and Sustainability Report containing the detailed site by site reports. Published separately due to size.
-
8 CONCLUSIONS AND KEY LEARNING
The Family Nurse Partnership (FNP) is a preventative prgramme for first time teenage mothers and their babies. FNP is being tested in Scotland for the first time. This is the second interim evaluation report and focuses on the late pregnancy and
-
C. DRAFT Plan for TIDAL Energy
The Draft Sectoral Marine Plans for Offshore Wind, Wave and Tidal energy in Scottish Waters represent Scottish Ministers' proposed spatial policy for the development of commercial scale offshore renewable energy at a national and regional level.
-
3 THE EVALUATION OF FNP IN SCOTLAND
The Family Nurse Partnershhip (FNP) is a preventative programme for first time teenage mothers and their babies. FNP is being tested in Scotland for the first time. This is the first interim evaluation report and focuses on the intake and early
-
Supporting documents
This is the summary report on analysis on feedback received on the National Transitions to Adulthood Strategy: statement of intent.
-
Section 1: General comments on the pathway
An analysis of the responses to the consultation on the draft clinical pathway for healthcare professionals working to support adults who present having experienced rape or sexual assault.
-
A national agency for Scottish education
Response to the report by the independent advisor on education reform, Professor Ken Muir.
-
3. Literature review
Research to investigate whether changes made to the building standards guidance in 2015 (standard 3.14) have resulted in better occupant interaction with the dwellings natural ventilation components and improved levels of indoor air quality within
-
Promoting Best Practice for Inshore Fisheries: a consultation on measures to tackle gear conflict in Scottish inshore waters
Gear conflict is a longstanding and complex problem in Scottish inshore waters. A Marine Scotland consultation explored spatial separation (particularly in known hotspots), vessel location monitoring systems, websites to detail where static gear had
-
1 Healthy ecosystems
A strategy for the conservation and enhancement of biodiversity in Scotland.
There is a problem
Thanks for your feedback