Search Results
Showing 7,401 to 7,410 of 8,113 results for sea lice
-
APPENDIX F: Draft HRA Record
This report summarises the findings of the Sustainability Appraisal undertaken on the draft pilot Pentland Firth and Orkney Waters Marine Spatial Plan incorporating a Strategic Environmental Assessment (SEA) required under Directive 2001/42/EC and
-
Annex B: Respondent List
Consultation report regarding the transposition of the European Environmental Impact Assessment (EIA) Directive into Scottish legislation.
-
Annex A: Table 2 - SRDP 2014 - 2020 Policy Development: Key Milestones
Stage 2 document setting out the final proposals for the new rural development programme period (2014-2020).
-
Annex A
Scotland's offshore wind route map: Developing Scotland's offshore wind industry to 2020.
-
8 Appendix 2. Related OREG Working and Other groups
The report describes the current state of knowledge of effects of offshore renewable energy devices on marine mammals and then identifies a prioritised list of research gaps.
-
Footnotes
This is our second report on proposals and policies (RPP2) for meeting our climate change targets.
-
Annex C – Local Development Plan Process
Part C of the local development planning - regulations and guidance consultation sets out: (1) the overall aims and expectations for new style LDPs; (2) the process of how to achieve a new style plans; (3) and detailed thematic guidance on how new
-
PARTIAL BUSINESS AND REGULATORY IMPACT ASSESSMENT
Consultation paper proposing the introduction of registerable marine activities and introducing a requirement for pre-application consultation for applications for certain classes of marine licence.
-
ENDNOTES AND REFERENCES
Guidance to support public bodies in exercising their duties under the Climate Change (Scotland) Act 2009.
-
Summary
The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future
There is a problem
Thanks for your feedback