Search Results

Filter by

Content type

Select which publication types you would like to see

Topic

Select which topics you would like to see

Updated

Filter by date

For example, 21/01/2022

For example, 21/01/2022

Showing 7,431 to 7,440 of 8,112 results for sea lice


  1. Annex D: Suggestions Not Thought to be Suitable for National Development Status

    Report of assessment for the draft national developments as part of Scotland 2045 Our Fourth National Planning Framework.

    Part of:
    Scotland 2045 - fourth National Planning Framework - draft - national developments: assessment report
  2. Analysis of responses

    Report analysing responses to the 2019 to 2020 targeted stakeholder consultation on the use of Fixed Penalty Notices for wildlife offences.

    Part of:
    Use of Fixed Penalty Notices for wildlife offences in Scotland: consultation analysis
  3. Section 5

    Analysis of the responses received to the consultation on the draft Strategic Management Plan for the Scottish Crown Estate.

    Part of:
    Scottish Crown Estate draft strategic management plan: consultation analysis
  4. C12. Telecom Cables

    The study reported here provides a high level socio-economic appraisal of the potential costs and benefits to activities that may arise as a result of offshore wind, wave or tidal development within the Draft Plan Options as part of possible future

    Part of:
    Draft Sectoral Marine Plans for Offshore Renewable Energy in Scottish Waters: Socio - Economic Assesment
  5. 6 Best practice for multi-survey analyses of seabird distributions

    This study developed best practice guidance to combine seabird survey data collected from different platforms based on a literature review, expert knowledge and a bespoke model development including sensitivity analysis. This can be used in

    Part of:
    Develop best practice recommendations for combining seabird study data collected from different platforms: study
  6. Oil and Gas Industry Crossover

    Report of study which examined the technical, logistical, contractual and economic feasibility of installing a deep geothermal single well system at the new site of the Aberdeen Exhibition and Conference Centre.

    Part of:
    Feasibility Report of a Deep Geothermal Single Well, Aberdeen Exhibition and Conference Centre
  7. Protected Area D - Loch Sunart to Sound of Jura MPA

    2014 Consultation on the Management of Inshore Special Areas of Conservation and Marine Protected Areas Overview document.

    Part of:
    2014 Consultation on the Management of Inshore Special Areas of Conservation and Marine Protected Areas Overview
  8. SECTION 5: COMPLYING WITH LEGISLATION, STATUTORY GUIDANCE CODES OF PRACTICE AND SERVICE EXPENDITURE ANALYSIS

    Guidance relating to the role of Housing Revenue Accounts (HRA).

    Part of:
    Guidance on the operation of Local Authority Housing Revenue Accounts (HRAs) in Scotland
  9. 9 References

    This project developed a new framework to enable the assessment of collision, displacement and barrier effects on seabirds from offshore renewable developments to be integrated into a single overall assessment of combined impacts.

    Part of:
    Offshore wind developments assessment - seabird collision risk, displacement and barrier effects: study
  10. 4 Background: Collision risk modelling

    This project developed a new framework to enable the assessment of collision, displacement and barrier effects on seabirds from offshore renewable developments to be integrated into a single overall assessment of combined impacts.

    Part of:
    Offshore wind developments assessment - seabird collision risk, displacement and barrier effects: study
Back to top